Lexus IS250 IS220d GSE20 ALE20 - AUDIO / VISUAL
NETWORK GATEWAY ECU - INSTALLATION
1. INSTALL NETWORK GATEWAY ECU |

Install the network gateway ECU.

Engage the 2 claws to install the cover.
Connect the connector.
2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (for LHD) |

Connect the connectors.
Engage the 2 claws.
Install the glove compartment door assembly with the 5 screws.
3. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY (for LHD) |
4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD) |

Engage the 4 clips and install the No. 2 instrument panel under cover sub-assembly.
5. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (for RHD) |

Connect the connectors.
Engage the 7 clips and install the lower instrument panel finish panel sub-assembly.
6. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD) |

Connect the connectors.
Insert the No. 1 instrument panel under cover sub-assembly into the guide as shown in the illustration.
Engage the 2 claws.
Install the No. 1 instrument panel under cover sub-assembly with the 2 screws <E-.
7. INSTALL SIDE INSTRUMENT PANEL |

Engage the 5 claws and 3 clips, and then install the side instrument panel RH.
8. INSTALL FRONT DOOR OPENING TRIM COVER |

Engage the 6 claws and install the front door opening trim cover RH.
9. INSTALL FRONT DOOR SCUFF PLATE |
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
11. PERFORM INITIALIZATION |
- NOTICE:
- Some systems need initialization when disconnecting the cable from the negative battery terminal .