Automatic Transaxle Assembly Removal

Drivetrain. Corolla. Zre142 Aze141

  1. REMOVE ENGINE ASSEMBLY WITH TRANSAXLE

  2. REMOVE DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT

  3. INSTALL ENGINE HANGERS

  4. REMOVE FRONT ENGINE MOUNTING INSULATOR

  5. REMOVE REAR ENGINE MOUNTING INSULATOR

  6. REMOVE STARTER ASSEMBLY

  7. DISCONNECT WIRE HARNESS AND CONNECTOR

  8. REMOVE AUTOMATIC TRANSAXLE ASSEMBLY

  9. REMOVE FRONT ENGINE MOUNTING BRACKET

  10. REMOVE REAR ENGINE MOUNTING BRACKET

  11. REMOVE ENGINE MOUNTING BRACKET LH

  12. REMOVE NO. 1 TRANSMISSION CONTROL CABLE BRACKET

  13. REMOVE TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY

  14. REMOVE OIL COOLER TUBE

  15. REMOVE SPEEDOMETER DRIVEN HOLE COVER SUB-ASSEMBLY

  16. REMOVE UPPER TRANSAXLE CASE COVER

  17. REMOVE WIRE HARNESS CLAMP BRACKET

  18. REMOVE TORQUE CONVERTER ASSEMBLY

Automatic Transaxle Assembly -- Removal



1. REMOVE ENGINE ASSEMBLY WITH TRANSAXLE
HINT:
See the steps from "Discharge Fuel System Pressure" through "Remove Engine Assembly with Transaxle" (COROLLA_ZRE142 RM000001BC301CX.html).


2. REMOVE DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT


    Corolla. Zre142 Aze141
  1. Remove the flywheel housing under cover.



    Corolla. Zre142 Aze141
  1. Turn the crankshaft to gain access and remove the 6 bolts while holding the crankshaft pulley bolt with a wrench.

    NOTICE:
    One of the 6 bolts has a different color than the other ones.


3. INSTALL ENGINE HANGERS


    Corolla. Zre142 Aze141.U250E Automatic Transmission Transaxle.Automatic Transaxle System.Automatic Transaxle Assembly  Removal
  1. Install the No. 1 and No. 2 engine hangers with new bolts as shown in the illustration.

    Torque:
    38 N*m{387 kgf*cm, 28 ft.*lbf}
    Item
    Part No.
    No. 1 engine hanger
    12281-28010
    No. 2 engine hanger
    12282-28010 or 12282-AB010
    Bolt
    90080-10177


    Corolla. Zre142 Aze141
  1. Using an engine sling device and a chain block, suspend the engine assembly with transaxle.



4. REMOVE FRONT ENGINE MOUNTING INSULATOR


    Corolla. Zre142 Aze141
  1. Remove the through bolt and nut, and separate the front engine mounting insulator.



5. REMOVE REAR ENGINE MOUNTING INSULATOR


    Corolla. Zre142 Aze141
  1. Remove the through bolt and separate the rear engine mounting insulator.



6. REMOVE STARTER ASSEMBLY


    Corolla. Zre142 Aze141
  1. Disconnect the terminal 50 connector from the starter assembly.

  1. Remove the nut and disconnect the wire harness from terminal 30.



    Corolla. Zre142 Aze141
  1. Remove the 2 bolts, wire harness clamp bracket and starter assembly.



7. DISCONNECT WIRE HARNESS AND CONNECTOR


    Corolla. Zre142 Aze141
  1. Remove the bolt, disconnect the 3 engine wire clamps and speed sensor connector.



    Corolla. Zre142 Aze141
  1. Disconnect the engine wire clamp, speed sensor connector, park/neutral position switch connector and transmission wire connector.



8. REMOVE AUTOMATIC TRANSAXLE ASSEMBLY


    Corolla. Zre142 Aze141
  1. Remove the 5 bolts.



    Corolla. Zre142 Aze141
  1. Remove the 4 lower side mounting bolts.

  1. Separate and remove the automatic transaxle.



9. REMOVE FRONT ENGINE MOUNTING BRACKET


    Corolla. Zre142 Aze141
  1. Remove the 3 bolts and front engine mounting bracket.



10. REMOVE REAR ENGINE MOUNTING BRACKET


    Corolla. Zre142 Aze141
  1. Remove the 3 bolts and rear engine mounting bracket.



11. REMOVE ENGINE MOUNTING BRACKET LH


    Corolla. Zre142 Aze141
  1. Remove the 3 bolts and engine mounting bracket LH.



12. REMOVE NO. 1 TRANSMISSION CONTROL CABLE BRACKET


    Corolla. Zre142 Aze141
  1. Remove the 2 bolts and No. 1 transmission control cable bracket.



13. REMOVE TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY


    Corolla. Zre142 Aze141
  1. Remove the transmission oil level gauge sub-assembly.

  1. Remove the bolt and remove the transmission oil filler tube sub-assembly.

  1. Remove the O-ring from the transmission oil filler tube sub-assembly.



14. REMOVE OIL COOLER TUBE


    Corolla. Zre142 Aze141
  1. Remove the 2 hose clamps, bolt and oil cooler tube sub-assembly.



15. REMOVE SPEEDOMETER DRIVEN HOLE COVER SUB-ASSEMBLY


    Corolla. Zre142 Aze141
  1. Remove the bolt and hole cover from the transaxle case.

  1. Remove the O-ring from the hole cover.



16. REMOVE UPPER TRANSAXLE CASE COVER


    Corolla. Zre142 Aze141
  1. Remove the 3 bolts and upper transaxle case cover.



17. REMOVE WIRE HARNESS CLAMP BRACKET


    Corolla. Zre142 Aze141
  1. Remove the bolt and wire harness clamp bracket.



18. REMOVE TORQUE CONVERTER ASSEMBLY
  1. Remove the torque converter assembly from the automatic transaxle.