Lexus IS250 IS220d GSE20 ALE20 4GR-FSE EMISSION CONTROL
VENTILATION VALVE - INSTALLATION
1. INSTALL VENTILATION VALVE |

Install the ventilation valve.
Apply adhesive to 2 or 3 threads.
- Adhesive:
- Part No. 08833-00070, THREE BOND 1324 or equivalent.
Install the ventilation valve.
- Torque:
- 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
2. CONNECT VENTILATION HOSE |

Connect the ventilation hose to the ventilation valve.
3. INSTALL V-BANK COVER SUB-ASSEMBLY |

Engage the 2 clips on the front of the cover, and then engage the clip on the rear to install the V-bank cover.
- NOTICE:
Be sure to engage the clips securely.
Do not apply excessive force or do not hit the cover to engage the clips. This may cause the cover to break.