Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS
SKID CONTROL BUZZER - INSTALLATION
1. INSTALL SKID CONTROL BUZZER ASSEMBLY (for LHD) |

Connect the buzzer connector.
- NOTICE:
- Securely connect the connector.
Attach the clamp to install the buzzer.
- NOTICE:
2. INSTALL SKID CONTROL BUZZER ASSEMBLY (for RHD) |

Connect the buzzer connector.
- NOTICE:
- Securely connect the connector.
Attach the clamp to install the buzzer.
- NOTICE:
3. INSTALL NO. 1 SWITCH HOLE BASE |

Connect the connectors.
Attach the 4 claws to install the No. 1 switch hole base.
4. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL |
Connect the connectors.

for Automatic Air Conditioning System:
Attach the 2 claws to install the room temperature sensor.

Attach the 2 claws to connect the 2 control cables.
w/ Driver Side Knee Airbag:
Attach the 16 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.
w/o Driver Side Knee Airbag:
Attach the 9 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.

Attach the 2 claws to close the hole cover.
5. INSTALL COWL SIDE TRIM BOARD |

Attach the 2 clips to install the cowl side trim board.
Install the cap nut.
6. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY |

Connect the connectors.
Attach the 3 claws to install the No. 1 instrument panel under cover.
Install the 2 screws.
7. INSTALL FRONT DOOR SCUFF PLATE |
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().