Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE STARTING
STARTER - INSTALLATION
1. INSTALL STARTER ASSEMBLY |
Install the flywheel housing side cover.
Install the starter with the 2 bolts.
- Torque:
- 37 N*m{ 377 kgf*cm, 27 ft.*lbf}
Install the starter wire with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm, 87 in.*lbf}
Connect the starter connector.
2. INSTALL STARTER COVER |
Install the starter cover with the 3 bolts.
- Torque:
- 12 N*m{ 117 kgf*cm, 8 ft.*lbf}
3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH |
()
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().