Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL
AIR SWITCHING VALVE (for Bank 2) - INSTALLATION
1. INSTALL AIR SWITCHING VALVE ASSEMBLY |

Install a new gasket and the air switching valve with the 3 bolts.
- Torque:
- 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
*1 | Air Switching Valve |
*2 | Claw |
*3 | No. 3 Air Tube |
- NOTICE:
- Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.
Install the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Attach the wire harness clamp and connect the air switching valve connector.
2. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE |

Align the paint mark with the projection and connect the No. 1 air injection system hose.
*1 | Protrusion |
*2 | Paint Mark |
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
3. CONNECT NO. 3 PCV HOSE |
Connect the No. 3 PCV hose.
4. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose, and then tighten the hose clamp.
- Torque:
- 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}
Attach the 4 clamps.
Connect the mass air flow meter connector and attach the clamp.
Connect the No. 2 PCV hose and No. 1 air hose.
5. INSTALL V-BANK COVER SUB-ASSEMBLY |

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
*1 | Grommet |
*2 | Pin |
*3 | Hook |
*4 | Bracket |