Shift Solenoid Valve Inspection
INSPECT SHIFT SOLENOID VALVE SL1
INSPECT SHIFT SOLENOID VALVE S1
INSPECT SHIFT SOLENOID VALVE S2
INSPECT SHIFT SOLENOID VALVE S3
INSPECT SHIFT SOLENOID VALVE S4
INSPECT SHIFT SOLENOID VALVE SL2
INSPECT SHIFT SOLENOID VALVE SR
INSPECT SHIFT SOLENOID VALVE SLT
INSPECT SHIFT SOLENOID VALVE SLU
Shift Solenoid Valve -- Inspection |
1. INSPECT SHIFT SOLENOID VALVE SL1 |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
2. INSPECT SHIFT SOLENOID VALVE S1 |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
Solenoid Connector (S1) - Solenoid Body (S1)
| 11 to 15 Ω
|
Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
3. INSPECT SHIFT SOLENOID VALVE S2 |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
Solenoid Connector (S2) - Solenoid Body (S2)
| 11 to 15 Ω
|
Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
4. INSPECT SHIFT SOLENOID VALVE S3 |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
Solenoid Connector (S3) - Solenoid Body (S3)
| 11 to 15 Ω
|
Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of the valve.
- OK:
- The solenoid makes an operating sound.
5. INSPECT SHIFT SOLENOID VALVE S4 |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
Solenoid Connector (S4) - Solenoid Body (S4)
| 11 to 15 Ω
|
Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
6. INSPECT SHIFT SOLENOID VALVE SL2 |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
7. INSPECT SHIFT SOLENOID VALVE SR |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
Solenoid Connector (SR) - Solenoid Body (SR)
| 11 to 15 Ω
|
Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
8. INSPECT SHIFT SOLENOID VALVE SLT |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, and check operation movement of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.
9. INSPECT SHIFT SOLENOID VALVE SLU |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, and check operation of the valve.
- NOTICE:
- While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.
- OK:
- The solenoid makes an operating sound.