Generator -- Installation |
1. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the bolt and 2 nuts.
- HINT:
- Install the bolt and 2 nuts in alphabetical order.
- Torque:
- 39 N*m{398 kgf*cm, 29 ft.*lbf} for bolt A and nut B
- 15.5 N*m{158 kgf*cm, 11 ft.*lbf} for nut C
Install the ground cable with the bolt D.
Install the battery cable with the nut, and then attach the rubber cap.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
![]() |
Install the bracket with the bolt.
- Torque:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
Connect the cable to the generator.
2. INSTALL V-RIBBED BELT |
Set the V-belt to everything except the No. 2 idler pulley, as shown in the illustration.
![]() |
Loosen the V-belt by turning the belt tensioner counterclockwise.
Then set the V-belt to the idler pulley.
After a new belt has been installed, check that the mark is within the A range shown in the illustration.
![]() |
3. INSTALL AIR CLEANER ASSEMBLY WITH INTAKE AIR CONNECTOR PIPE |
Install the air cleaner assembly with the 3 bolts.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
Connect the MAF meter connector and clamp to the air cleaner.
![]() |
4. INSTALL AIR CLEANER INLET |
Install the inlet with the bolt.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
5. INSTALL ENGINE ROOM COVER SIDE RH |
Install the side cover with the 2 clips and nut.
![]() |
6. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the duct seal with the 7 clips.
7. INSTALL ENGINE UNDER COVER |
![]() |
Install the under cover with the 3 clips and 10 screws.
8. INSTALL V-BANK COVER SUB-ASSEMBLY |
Install the cover with the 2 nuts.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
10. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.