Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1VD-FTV FUEL
FUEL COOLER (for Engine Room Side) - INSTALLATION
1. CONNECT NO. 7 WATER BY-PASS HOSE |

Connect the water by-pass hose to the fuel cooler.
- HINT:
2. INSTALL FUEL COOLER ASSEMBLY |

Install the fuel cooler with the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
3. CONNECT NO. 3 FUEL HOSE |

Connect the fuel hose to the fuel cooler.
- HINT:
4. CONNECT NO. 6 WATER BY-PASS HOSE |
5. INSTALL NO. 4 NOZZLE LEAKAGE PIPE |

Temporarily install a new gasket and the No. 4 nozzle leakage pipe with the union bolt and bolt.
Tighten the union bolt and bolt in the order shown in the illustration.
- Torque:
- for union bolt:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
- for bolt:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Connect the No. 2 fuel hose to the fuel cooler.
6. INSTALL NO. 3 NOZZLE LEAKAGE PIPE |

Temporarily install a new gasket and the No. 3 nozzle leakage pipe with the union bolt and bolt.
Tighten the union bolt and bolt in the order shown in the illustration.
- Torque:
- for union bolt:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
- for bolt:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Connect the No. 1 fuel hose to the fuel cooler.
7. INSTALL EGR COOLER INSULATOR (w/ EGR System) |
8. INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER (w/ EGR System) |
Connect the No. 5 water by-pass hose to the water by-pass outlet.

Install 2 new gaskets and the EGR valve with EGR cooler with the 6 bolts labeled A and 4 bolts labeled B shown in the illustration.
- Torque:
- for bolt A:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
- for bolt B:
- 29 N*m{ 296 kgf*cm, 21 ft.*lbf}
- HINT:
- The gasket claws should face toward the No. 1 and No. 2 EGR pipes.
9. INSTALL EGR PIPE INSULATOR (w/ EGR System) |
Install the EGR pipe insulator with the 2 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
- NOTICE:
- If the No. 1 and No. 2 EGR pipe insulator installation stay is deformed, or the bolt holes of the EGR pipe insulator do not align, replace the No. 1 and No. 2 EGR pipes as a set.
10. INSTALL INTAKE MANIFOLD INSULATOR (w/ EGR System) |
11. INSTALL NO. 3 INTAKE MANIFOLD |

Install 2 new gaskets to the No. 1 and No. 2 intake manifolds.
Install the No. 3 intake manifold with the 16 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Item | Length |
Bolt A | 25 mm (0.984 in.) |
Bolt B | 70 mm (2.76 in.) |
12. CONNECT NO. 2 ENGINE WIRE |

Connect the No. 2 engine wire with the 3 bolts.
- Torque:
- for bolt A:
- 13 N*m{ 133 kgf*cm, 10 ft.*lbf}
- for bolt B:
- 32 N*m{ 326 kgf*cm, 24 ft.*lbf}
Attach the 2 wire harness clamps.
13. INSTALL INTAKE PIPE |
w/ EGR System:
Install 2 new gaskets and the intake pipe with the 6 bolts and 2 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
w/o EGR System:
Install a new gasket and the intake pipe with the 4 bolts and 2 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
14. INSTALL NO. 2 INTAKE MANIFOLD INSULATOR (w/ Intercooler) |
15. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR (w/ Intercooler) |
16. INSTALL COMMON RAIL ASSEMBLY LH AND RH |
()