Relay On-Vehicle Inspection
INSPECT HEADLIGHT RELAY (H-LP LO, H-LP LH Relay)
INSPECT HEADLIGHT RELAY (H-LP HI, H-LP RH Relay)
INSPECT FOG LIGHT RELAY (FR FOG)
INSPECT STOP LIGHT CONTROL RELAY ASSEMBLY
INSPECT INTEGRATION RELAY (DRL)
Relay -- On-Vehicle Inspection |
1. INSPECT HEADLIGHT RELAY (H-LP LO, H-LP LH Relay) |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
3 - 5
| Battery voltage is not applied to terminals 1 and 2
| 10 kΩ or higher
|
Battery voltage is applied to terminals 1 and 2
| Below 1 Ω
|
If the result is not as specified, replace the headlight relay.
2. INSPECT HEADLIGHT RELAY (H-LP HI, H-LP RH Relay) |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
3 - 5
| Battery voltage is not applied to terminals 1 and 2
| 10 kΩ or higher
|
Battery voltage is applied to terminals 1 and 2
| Below 1 Ω
|
If the result is not as specified, replace the headlight relay.
3. INSPECT FOG LIGHT RELAY (FR FOG) |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
3 - 5
| Battery voltage is not applied to terminals 1 and 2
| 10 kΩ or higher
|
Battery voltage is applied to terminals 1 and 2
| Below 1 Ω
|
If the result is not as specified, replace the fog relay.
4. INSPECT STOP LIGHT CONTROL RELAY ASSEMBLY |
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Switch Condition
| Specified Condition
|
A39-6 (+B) - A39-4 (GND)
| Always
| 11 to 14 V
|
A39-2 (STP) - Body grand
| Brake pedal depressed
| 11 to 14 V
|
Brake pedal not depressed
| Below 1 V
|
A39-8 (OUT) - Body grand
| Brake pedal depressed
| 11 to 14 V
|
Brake pedal not depressed
| Below 1 V
|
If the result is not as specified, replace the stop light control relay assembly.
Text in Illustration*a
| Component with harness connected (Stop Light Control Relay Assembly
|
5. INSPECT INTEGRATION RELAY (DRL) |
Text in Illustration*A
| for LHD
| *B
| for RHD
|
*a
| Component without harness connected (Integration Relay)
| -
| -
|
- NOTICE:
- The DRL relay is built into the integration relay.
- Before performing the relay inspections for the relays of the integration relay, inspect the DRL fuse.
Inspect the DRL relay.
Measure the resistance and voltage according to the value(s) in the table below.
- for LHD:
Standard Resistance:Tester Connection
| Condition
| Specified Condition
|
1Y-1 - 1R-3
| Always
| 10 kΩ or higher
|
Standard Voltage:Tester Connection
| Condition
| Specified Condition
|
1R-3 - Body ground
| Battery voltage is applied to terminals 1Y-1 and 1R-4
| 11 to 14 V
|
- for RHD:
Standard Resistance:Tester Connection
| Condition
| Specified Condition
|
1X-1 - 1R-3
| Always
| 10 kΩ or higher
|
Standard Voltage:Tester Connection
| Condition
| Specified Condition
|
1R-3 - Body ground
| Battery voltage is applied to terminals 1X-1 and 1R-4
| 11 to 14 V
|
If the result is not as specified, replace the integration relay.