Light Control Rheostat Installation

Vehicle Interior. Land Cruiser. Urj200, 202 Grj200 Vdj200
Meter Gauge Display. Land Cruiser. Urj200, 202 Grj200 Vdj200

  1. INSTALL LIGHT CONTROL RHEOSTAT

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

  3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  4. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH

  5. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION

  6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

Light Control Rheostat -- Installation



1. INSTALL LIGHT CONTROL RHEOSTAT


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 2 claws to install the rheostat.



2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Connect the connector.

  1. Attach the 9 claws to install the instrument cluster finish panel.



3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


  1. Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.


    Land Cruiser. Urj200, 202 Grj200 Vdj200.Meter Gauge Display.Meter / Gauge System.Light Control Rheostat  Installation


    Text in Illustration
    *A
    w/ Entry and Start System
    *B
    w/o Entry and Start System


4. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Connect the connectors and 2 clamps.

  1. Attach the 8 claws to install the panel pad.

  1. Install the screw.

  1. Install the clip.



5. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 7 claws to install the panel cushion.



6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.