  1. INSTALL NETWORK GATEWAY ECU

  2. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY

  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

  4. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  5. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  6. INSTALL COWL SIDE TRIM BOARD RH

  7. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

  8. INSTALL INSTRUMENT SIDE PANEL RH

  9. INSTALL FRONT DOOR SCUFF PLATE RH

  10. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH

  11. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION

  12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  13. CHECK SRS WARNING LIGHT

Network Gateway Ecu (For Rhd) -- Installation



1. INSTALL NETWORK GATEWAY ECU
  1. Install the network gateway ECU with the nut.

  1. Connect the connector.



2. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY
  1. Check that the ignition switch is off.

  1. Check that the cable is disconnected from the negative (-) battery terminal.

    CAUTION:
    Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.


    Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Rhd)  Installation
  1. Connect the airbag connector and lock the connector lock.

    Text in Illustration
    *a
    Connector Lock
    NOTICE:
    When handling the airbag connector, take care not to damage the airbag wire harness.
  1. Install the driver side knee airbag assembly with the 5 bolts.

    Torque:
    12 N*m{122 kgf*cm, 9 ft.*lbf}


3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL
  1. Connect the connectors.



    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 2 claws to connect the 2 control cables.



  1. for Automatic Air Conditioning System:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 2 claws to install the room temperature sensor.



  1. w/ Driver Side Knee Airbag:



    1. Attach the 16 claws to install the lower No. 1 instrument panel finish panel.


      Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Rhd)  Installation



  1. w/o Driver Side Knee Airbag:



    1. Attach the 9 claws to install the lower No. 1 instrument panel finish panel.


      Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Rhd)  Installation



    Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Rhd)  Installation
  1. Install the 2 bolts <B>.

    Text in Illustration
    *a
    Bolt <B>


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 2 claws to close the hole cover.



4. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.



5. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.



6. INSTALL COWL SIDE TRIM BOARD RH


Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Rhd)  Installation
  1. Attach the 2 clips to install the cowl side trim board RH.

  1. Install the cap nut.

    Text in Illustration
    *a
    Cap Nut


7. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY


Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Rhd)  Installation
  1. Connect the connector.

  1. Attach the 3 claws to install the No. 1 instrument panel under cover sub-assembly.

  1. Install the 2 screws <A>.

    Text in Illustration
    *a
    Screw <A>


8. INSTALL INSTRUMENT SIDE PANEL RH


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. w/ Airbag Cut Off Switch:

    1. Connect the connector.

  1. Attach the 6 claws to install the instrument side panel RH.



9. INSTALL FRONT DOOR SCUFF PLATE RH
HINT:
Use the same procedures described for the LH side.


10. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH


  1. for Type A:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 11 claws and guide to install the lower instrument panel pad sub-assembly RH.



    2. Land Cruiser. Urj200, 202 Grj200 Vdj200
    3. Install the screw and clip.



  1. for Type B:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 7 claws to install the lower instrument panel pad sub-assembly RH.



    2. Land Cruiser. Urj200, 202 Grj200 Vdj200
    3. Install the screw and clip.



11. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION


  1. for Type A:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 4 claws and 3 clips to install the No. 1 instrument panel finish panel cushion.



  1. for Type B:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 7 claws to install the panel No. 1 instrument panel finish panel cushion.



12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


13. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).