Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE ENGINE CONTROL
IGNITION COIL AND SPARK PLUG - INSTALLATION
1. INSTALL SPARK PLUG |
Using a 16 mm plug wrench, install the 8 spark plugs.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
2. INSTALL IGNITION COIL ASSEMBLY |
for Bank 2:
Install the 4 ignition coils with the 4 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Connect the 4 ignition coil connectors.
Attach the 3 clamps and connect the engine wire.
Connect the water by-pass pipe with the 2 bolts.
- Torque:
- 18 N*m{ 184 kgf*cm, 13 ft.*lbf}
for Bank 1:
Install the 4 ignition coils with the 4 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Connect the 4 ignition coil connectors.
Attach the 4 clamps and connect the engine wire.
3. INSTALL AIR CLEANER AND HOSE |
Install the air cleaner and hose with the 3 bolts, and then tighten the hose clamp.
- Torque:
- for bolt:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
- for hose clamp:
- 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}
Attach the clamp and connect the mass air flow meter connector.
Connect the No. 2 PCV hose and No. 1 air hose.
4. INSTALL V-BANK COVER SUB-ASSEMBLY |

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
*1 | Grommet |
*2 | Pin |
*3 | Hook |
*4 | Bracket |