Automatic Transmission System (For 1Ur-Fe) Pattern Select Switch Power Mode Circuit
Drivetrain. Land Cruiser. Urj200, 202 Grj200 Vdj200
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
INSPECT PWR SWITCH (INTEGRATION CONTROL AND PANEL ASSEMBLY)
CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - BODY GROUND)
CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - ECM)
AUTOMATIC TRANSMISSION SYSTEM (for 1UR-FE) - Pattern Select Switch Power Mode Circuit |
DESCRIPTION
The ECM memory contains the programs for the normal and power shift patterns and lock-up pattern.By following the programs corresponding to the signals from the PWR switch (integration control and panel assembly), the park/neutral position switch and other various sensors, the ECM switches the solenoid valves on and off, and controls the transmission gear change and the lock-up clutch operation.
WIRING DIAGRAM
INSPECTION PROCEDURE
When the PWR switch is pushed, switch contact is made and power mode is selected. To cancel power mode, push the PWR switch once again.
1.INSPECT PWR SWITCH (INTEGRATION CONTROL AND PANEL ASSEMBLY) |
Remove the integration control and panel assembly (Click here).
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Switch Condition
| Specified Condition
|
6 (P) - 5 (E)
| PWR switch on
| Below 1 Ω
|
6 (P) - 5 (E)
| PWR switch off
| 10 kΩ or higher
|
Text in Illustration*a
| Component without harness connected (Integration Control and Panel Assembly)
|
| REPLACE INTEGRATION CONTROL AND PANEL ASSEMBLY (Click here) |
|
|
2.CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - BODY GROUND) |
Disconnect the integration control and panel assembly connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
V9-5 (E) - Body ground
| Always
| Below 1 Ω
|
Text in Illustration*a
| Front view of wire harness connector (to Integration Control and Panel Assembly)
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
3.CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - ECM) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
for LHDTester Connection
| Switch Condition
| Specified Condition
|
A38-51 (PWR) - Body ground
| PWR switch on
| Below 1 Ω
|
A38-51 (PWR) - Body ground
| PWR switch off
| 10 kΩ or higher
|
for RHDTester Connection
| Switch Condition
| Specified Condition
|
A52-51 (PWR) - Body ground
| PWR switch on
| Below 1 Ω
|
A52-51 (PWR) - Body ground
| PWR switch off
| 10 kΩ or higher
|
Text in Illustration*1
| for LHD
|
*2
| for RHD
|
*a
| Front view of wire harness connector (to ECM)
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
OK |
|
|
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here) |
|