Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
3Ur-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200
Purge Valve -- Installation |
1. INSTALL PURGE VSV |
Install the purge VSV with the bolt.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
![]() |
Connect the purge VSV connector.
Text in Illustration *a Upper
2. CONNECT PURGE LINE HOSE |
Connect the 2 purge line hoses.
- HINT:
- Turn the claw of the clip to the upper side.
3. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Bracket *2 Hook *3 Pin *4 Grommet
![]() |