Purge Valve Installation

Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Ur-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200

  1. INSTALL PURGE VSV

  2. INSTALL V-BANK COVER SUB-ASSEMBLY

Purge Valve -- Installation



1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    21 N*m{214 kgf*cm, 15 ft.*lbf}
  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.



2. INSTALL V-BANK COVER SUB-ASSEMBLY


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Purge Valve  Installation
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

    Text in Illustration
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket