Air Switching Valve (For Bank 1) Removal
REMOVE V-BANK COVER SUB-ASSEMBLY
DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE
REMOVE AIR SWITCHING VALVE ASSEMBLY
Air Switching Valve (For Bank 1) -- Removal |
1. REMOVE V-BANK COVER SUB-ASSEMBLY |
Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
Text in Illustration*1
| Grommet
|
*2
| Pin
|
*3
| Hook
|
*4
| Bracket
|
2. DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE |
Disconnect the connector.
Disconnect the No. 2 air injection system hose.
3. REMOVE AIR SWITCHING VALVE ASSEMBLY |
Remove the bolt and then disconnect the wire harness clamp bracket.
Remove the 2 bolts.
Remove the 3 bolts, air switching valve and gasket.
- NOTICE:
- Be careful not to damage the installation surface of the gasket.