Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE ENGINE CONTROL
CAMSHAFT OIL CONTROL VALVE - INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2) |
Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
Install the camshaft timing oil control valve with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
- NOTICE:
Connect the camshaft timing oil control valve connector.
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2) |
Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
Install the camshaft timing oil control valve with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
- NOTICE:
Connect the camshaft timing oil control valve connector.
3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1) |
Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
Install the camshaft timing oil control valve with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
- NOTICE:
Connect the camshaft timing oil control valve connector.
4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1) |
Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
Install the camshaft timing oil control valve with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
- NOTICE:
Connect the camshaft timing oil control valve connector.
5. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System) |
()
6. INSTALL NO. 1 AIR CLEANER HOSE |

Install the No. 1 air cleaner hose with the 2 hose clamps.
- Torque:
- 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}
*a | Protrusion |
*b | Groove |
*c | Top |
*d | Front |
Install the bolt.
- Torque:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
Connect the vacuum hose and No. 2 PCV hose.
7. INSTALL V-BANK COVER |

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
*1 | Pin |
*2 | Hook |