Sfi System Fuel Pump Control Circuit

Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Gr-Fe Engine Control. Land Cruiser. Urj200, 202 Grj200 Vdj200

DESCRIPTION

WIRING DIAGRAM

INSPECTION PROCEDURE

PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP/SPEED)

INSPECT FUEL PUMP ECU (POWER SOURCE VOLTAGE)

CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - BODY GROUND)

CHECK HARNESS AND CONNECTOR (FUEL PUMP - FUEL PUMP ECU)

INSPECT FUEL PUMP

CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM)

REPLACE FUEL PUMP ECU

CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED

CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - FUEL PUMP ECU)

INSPECT INTEGRATION RELAY (FUEL PMP)

PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP)

CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM)

REPLACE FUEL PUMP

REPLACE FUEL PUMP ECU

CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED

SFI SYSTEM - Fuel Pump Control Circuit


DESCRIPTION

The fuel pump circuit consists of the ECM, fuel pump and fuel pump ECU (which operates the fuel pump). Based on the engine output, the ECM determines the fuel pump speed. The speed is then converted to a duty signal and sent to the fuel pump ECU. Based on the signal sent from the ECM, the fuel pump ECU adjusts the fuel pump operation speed.

WIRING DIAGRAM

  1. for LHD:

Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Engine Control.Sfi System.Sfi System  Fuel Pump Control Circuit

  1. for RHD:

Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Engine Control.Sfi System.Sfi System  Fuel Pump Control Circuit


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
1.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP/SPEED)
  1. Connect the GTS to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the GTS on.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump/Speed.

  1. Check whether operating sounds can be heard while operating the fuel pump using the GTS.

    OK:
    Operating sounds can be heard from fuel pump.
    Result
    Result
    Proceed to
    NG
    A
    OK
    B


B
Go to step 11
A


2.INSPECT FUEL PUMP ECU (POWER SOURCE VOLTAGE)
Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Engine Control.Sfi System.Sfi System  Fuel Pump Control Circuit
  1. Disconnect the fuel pump ECU connector.

  1. Turn the ignition switch to ON.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    N14-6 (+B) - Body Ground
    Ignition switch ON
    11 to 14 V
    Text in Illustration
    *a
    Front view of wire harness connector
    (to Fuel Pump ECU)


NG
Go to step 9
OK


3.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - BODY GROUND)
  1. Disconnect the fuel pump ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    N14-3 (E) - Body ground
    Always
    Below 1 Ω


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


4.CHECK HARNESS AND CONNECTOR (FUEL PUMP - FUEL PUMP ECU)
  1. Disconnect the fuel pump connector.

  1. Disconnect the fuel pump ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    N1-4 (B2) - N14-1 (FP)
    Always
    Below 1 Ω
    N1-5 (E2) - N14-2 (FP-)
    Always
    Below 1 Ω
    N1-4 (B2) or N14-1 (FP) - Body ground
    Always
    10 kΩ or higher
    N1-5 (E2) or N14-2 (FP-) - Body ground
    Always
    10 kΩ or higher


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5.INSPECT FUEL PUMP
  1. Inspect the fuel pump (Click here).



NG
REPLACE FUEL PUMP (Click here)
OK


6.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM)
  1. Disconnect the fuel pump ECU connector.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD
    Tester Connection
    Condition
    Specified Condition
    N14-5 (FPC) - A38-52 (FPC)
    Always
    Below 1 Ω
    N14-5 (FPC) or A38-52 (FPC) - Body ground
    Always
    10 kΩ or higher
    for RHD
    Tester Connection
    Condition
    Specified Condition
    N14-5 (FPC) - A52-52 (FPC)
    Always
    Below 1 Ω
    N14-5 (FPC) or A52-52 (FPC) - Body ground
    Always
    10 kΩ or higher


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


7.REPLACE FUEL PUMP ECU
  1. Replace the fuel pump ECU (Click here).


NEXT


8.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
  1. Check the fuel pump operation.

    OK:
    Malfunction has been repaired successfully.


NG
REPLACE ECM (Click here)
OK

END

9.CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - FUEL PUMP ECU)
  1. Remove the integration relay from the engine room relay block.

  1. Disconnect the fuel pump ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1R-6 - N14-6 (+B)
    Always
    Below 1 Ω
    1R-6 or N14-6 (+B) - Body ground
    Always
    10 kΩ or higher


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


10.INSPECT INTEGRATION RELAY (FUEL PMP)
  1. Inspect the integration relay (FUEL PMP) (Click here).



NG
REPLACE INTEGRATION RELAY
OK

GO TO ECM POWER SOURCE CIRCUIT (Click here)

11.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP)
Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Engine Control.Sfi System.Sfi System  Fuel Pump Control Circuit
  1. Remove the fuel tank assembly (Click here).

  1. Remove the fuel pump from the fuel tank assembly.

  1. Clean the fuel pump to completely remove any remaining fuel.

  1. Connect the fuel pump connector.

    CAUTION:
    Make sure that there is no fuel remaining inside or on the outside of the fuel pump.
  1. Connect the GTS to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the GTS on.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump Duty.

  1. Operate the fuel pump using the Active Test function and measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    GTS Operation
    Specified Condition
    1 - 2
    FPC Duty: 25%
    3.2 to 4.05 V
    FPC Duty: 80%
    8.8 to 12.5 V
  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump/Speed.

  1. Operate the fuel pump using the Active Test function and measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    GTS Operation
    Specified Condition
    1 - 2
    ON (FPC Duty: 90%)
    9.0 to 14.0 V
    HINT:
    1. Be sure to measure the voltage with all the connectors connected.
    2. Before performing this inspection, check that the battery voltage is between 11 and 14 V (not depleted).
Text in Illustration
*a
Component with harness connected
(Fuel Pump)


NG
Go to step 14
OK


12.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM)
  1. Disconnect the fuel pump ECU connector.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD
    Tester Connection
    Condition
    Specified Condition
    N14-5 (FPC) - A38-52 (FPC)
    Always
    Below 1 Ω
    N14-5 (FPC) or A38-52 (FPC) - Body ground
    Always
    10 kΩ or higher
    for RHD
    Tester Connection
    Condition
    Specified Condition
    N14-5 (FPC) - A52-52 (FPC)
    Always
    Below 1 Ω
    N14-5 (FPC) or A52-52 (FPC) - Body ground
    Always
    10 kΩ or higher


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


13.REPLACE FUEL PUMP
  1. Replace the fuel pump (Click here).



NEXT
Go to step 15

14.REPLACE FUEL PUMP ECU
  1. Replace the fuel pump ECU (Click here).


NEXT


15.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
  1. Check the fuel pump operation.

    OK:
    Malfunction has been repaired successfully.


NG
REPLACE ECM (Click here)
OK

END