Power Source Network. Hilux. Tgn26, 36 Kun25, 26, 35, 36 Ggn25
1Gr-Fe Battery Charging. Hilux. Tgn26, 36 Kun25, 26, 35, 36 Ggn25
Generator -- Installation |
1. INSTALL GENERATOR ASSEMBLY |
Install the generator with the 2 bolts.
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
Connect the generator wire with the nut and 2 bolts.
- Torque:
- for nut:
- 9.8 N*m{100 kgf*cm, 87 in.*lbf}
- for bolt:
- 13 N*m{133 kgf*cm, 10 ft.*lbf}
Install the terminal cap.
Connect the generator connector.
2. INSTALL FAN AND GENERATOR V BELT |
Set the fan and generator V belt onto each part.
Text in Illustration *1 Vane Pump *2 Water Pump *3 No. 2 Idler *4 Generator *5 Cooler Compressor *6 No. 1 Idler *7 Crankshaft *8 V-ribbed Belt Tensioner
![]() |
While turning the belt tensioner counterclockwise, remove the pin.
- NOTICE:
- Make sure that the fan and generator V belt is properly installed to each pulley.
Check that the belt fits properly in the ribbed grooves.
- HINT:
- Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.
3. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.
- Torque:
- 7.5 N*m{76 kgf*cm, 66 in.*lbf}
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (HILUX_TGN26 RM000004QR3009X.html).