Engine Hybrid System. Hilux. Tgn26, 36 Kun25, 26, 35, 36 Ggn25
2Tr-Fbe Emission Control. Hilux. Tgn26, 36 Kun25, 26, 35, 36 Ggn25
Pcv Valve -- Installation |
1. INSTALL PCV VALVE SUB-ASSEMBLY |
Apply a light coat of engine oil to the O-ring.
Text in Illustration *1 O-Ring
![]() |
Install the PCV valve sub-assembly.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
- HINT:
- When reusing the PCV valve sub-assembly, inspect the O-ring.
Connect the PCV hose to the PCV valve sub-assembly.
Secure the hose with the clamp.
2. CONNECT WIRE HARNESS |
Attach the wire harness clamp.