Lexus IS250 IS220d GSE20 ALE20 - SUPPLEMENTAL RESTRAINT SYSTEM
CENTER AIRBAG SENSOR ASSEMBLY - INSTALLATION
1. INSTALL CENTER AIRBAG SENSOR ASSEMBLY |
Check that the engine switch is off.
Check that the battery negative (-) terminal is disconnected.
- NOTICE:
- After disconnecting the negative battery terminal, wait for at least 90 seconds before starting the operation.

Install the center airbag sensor assembly with the nut and 2 bolts.
- Torque:
- 17.5 N*m{ 179 kgf*cm, 13 ft.*lbf}
- NOTICE:
Check that there is no looseness in the installation parts of the center airbag sensor assembly.
Connect the holder (with connectors).
Check that the water-proof sheet is properly set.
2. INSTALL CONSOLE BOX |

Engage the 2 claws and 2 clips.

Install the 2 bolts <C-.

Install the 2 bolts <C-.
Connect the connector.

Connect the connectors.
Engage the 2 clamps.
Install the 2 bolts <C-.
3. INSTALL CONSOLE BOX REGISTER ASSEMBLY |

Engage the 2 claws and 4 clips, and then install the console box register assembly.
Install the rear ash receptacle assembly.
4. INSTALL REAR ASH RECEPTACLE ASSEMBLY |
5. INSTALL FRONT ASH RECEPTACLE SUB-ASSEMBLY |

Engage the 6 clips.

Close the snap.
6. INSTALL FRONT CONSOLE PANEL SUB-ASSEMBLY (for Manual Transmission) |

Engage the 6 clips.

Close the snap.
7. INSTALL REAR CONSOLE PANEL SUB-ASSEMBLY (for Manual Transmission) |

Engage the 7 claws and 2 clips.

Close the snap.
8. INSTALL CONSOLE PANEL SUB-ASSEMBLY (for Automatic Transmission) |

Connect the connectors.
Engage the 8 clips and install the console panel sub-assembly.
9. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH (for Automatic Transmission) |

Engage the claw and 2 clips, and then install the upper No. 2 console panel garnish.
10. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH (for Automatic Transmission) |

Engage the claw and 2 clips, and then install the upper No. 1 console panel garnish.
11. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transmission) |
12. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Automatic Transmission) |
13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
14. PERFORM INITIALIZATION |
Perform initialization .
- HINT:
- Some systems need initialization after reconnecting the cable to the negative battery terminal.
15. INSPECT SRS WARNING LIGHT |
Inspect the SRS warning light .