Front Evaporator Temperature Sensor Installation
INSTALL NO. 1 COOLER THERMISTOR
INSTALL NO. 1 COOLER EVAPORATOR SUB-ASSEMBLY
INSTALL COOLER EXPANSION VALVE
INSTALL AIR CONDITIONING HARNESS ASSEMBLY (for Automatic Air Conditioning System)
INSTALL BLOWER ASSEMBLY
Front Evaporator Temperature Sensor -- Installation |
1. INSTALL NO. 1 COOLER THERMISTOR |
Install the No. 1 cooler thermistor as shown in the illustration.
Part
| Length
|
A
| 34.3 mm
| 1.35 in.
|
B
| 20.9 mm
| 0.823 in.
|
C
| 50 mm
| 1.96 in.
|
- NOTICE:
- Be sure to insert the thermistor only once because reinserting it will not allow it to be firmly secured.
- When reusing the evaporator, insert the thermistor one row next to the one that has been used previously (X in the illustration).
- After inserting the thermistor, do not apply excessive force to the wire.
- Directly insert the thermistor until the edge of plastic case "a" comes into contact with evaporator "b".
2. INSTALL NO. 1 COOLER EVAPORATOR SUB-ASSEMBLY |
Sufficiently apply compressor oil to 2 new O-rings and the fitting surfaces. Install the 2 O-rings to the No. 1 cooler evaporator sub-assembly.
- Compressor oil:
- ND-OIL 8 or equivalent
- NOTICE:
- Keep the O-rings and O-ring fitting surfaces clean from dirt or foreign matter.
Install the No. 1 cooler evaporator sub-assembly together with the No. 1 cooler thermistor as a set.
Engage the clamp.
Engage the 4 claws as shown in the illustration.
Install the lower heater case with the 4 screws.
3. INSTALL COOLER EXPANSION VALVE |
Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.
- Torque:
- 3.5 N*m{36 kgf*cm, 31 in.*lbf}
4. INSTALL AIR CONDITIONING HARNESS ASSEMBLY (for Automatic Air Conditioning System) |
Connect the connector.
Engage each clamp and install the air conditioning harness assembly.
5. INSTALL BLOWER ASSEMBLY |
(COROLLA_ZRE142 RM000001HLU0Y7X.html)