Power Steering Link Installation

Steering. Camry. Acv40 Gsv40
Power Steering. Camry. Acv40 Gsv40

  1. INSTALL POWER STEERING RACK HOUSING HEAT INSULATOR (for 2GR-FE LHD)

  2. INSTALL POWER STEERING RACK HOUSING HEAT INSULATOR (for 2GR-FE RHD)

  3. INSTALL POWER STEERING LINK ASSEMBLY

  4. CONNECT PRESSURE FEED TUBE ASSEMBLY (for LHD)

  5. CONNECT PRESSURE FEED TUBE ASSEMBLY (for 2AZ-FE RHD)

  6. INSTALL RETURN TUBE ASSEMBLY (for 2AZ-FE RHD)

  7. CONNECT STEERING GEAR OUTLET RETURN TUBE (for 2AZ-FE RHD)

  8. CONNECT PRESSURE FEED TUBE ASSEMBLY (for 2GR-FE RHD)

  9. INSTALL RETURN TUBE ASSEMBLY (for 2GR-FE RHD)

  10. CONNECT STEERING GEAR OUTLET RETURN TUBE (for 2GR-FE RHD)

  11. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE

  12. CONNECT TIE ROD ASSEMBLY LH

  13. CONNECT TIE ROD ASSEMBLY RH

  14. CONNECT STEERING SLIDING YOKE

  15. INSTALL FRONT WHEELS

  16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  17. BLEED POWER STEERING FLUID

  18. CHECK POWER STEERING FLUID LEVEL

  19. CHECK FOR POWER STEERING FLUID LEAKAGE

  20. CHECK FOR EXHAUST GAS LEAKS

  21. PLACE FRONT WHEELS FACING STRAIGHT AHEAD

  22. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT

Power Steering Link -- Installation



1. INSTALL POWER STEERING RACK HOUSING HEAT INSULATOR (for 2GR-FE LHD)


    Camry. Acv40 Gsv40
  1. Install the power steering rack housing heat insulator to the power steering link assembly.



2. INSTALL POWER STEERING RACK HOUSING HEAT INSULATOR (for 2GR-FE RHD)


    Camry. Acv40 Gsv40
  1. Install the power steering rack housing heat insulator to the power steering link assembly with the bolt.

    Torque:
    9.8 N*m{100 kgf*cm, 87 in.*lbf}


3. INSTALL POWER STEERING LINK ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the power steering link assembly with the 2 bolts and 2 nuts.

    Torque:
    70 N*m{714 kgf*cm, 52 ft.*lbf}


4. CONNECT PRESSURE FEED TUBE ASSEMBLY (for LHD)


    Camry. Acv40 Gsv40
  1. Temporarily connect the pressure feed tube assembly to the power steering link assembly.



    Camry. Acv40 Gsv40
  1. Install the pressure feed tube assembly clamp with the 2 bolts.

    Torque:
    9.8 N*m{100 kgf*cm, 87 in.*lbf}


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Using SST, tighten the pressure feed tube assembly (pressure feed tube side).

    SST
    09023-12701
    Torque:
    Without SST:
    25 N*m{250 kgf*cm, 18 ft.*lbf}
    With SST:
    22 N*m{227 kgf*cm, 16 ft.*lbf}
    NOTICE:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when SST is parallel to the torque wrench.


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Using SST, tighten the pressure feed tube assembly (return tube side).

    SST
    09023-12701
    Torque:
    Without SST:
    25 N*m{250 kgf*cm, 18 ft.*lbf}
    With SST:
    22 N*m{227 kgf*cm, 16 ft.*lbf}
    NOTICE:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when SST is parallel to the torque wrench.


5. CONNECT PRESSURE FEED TUBE ASSEMBLY (for 2AZ-FE RHD)


    Camry. Acv40 Gsv40
  1. Install the pressure feed tube assembly clamp with the bolt.

    Torque:
    9.8 N*m{100 kgf*cm, 87 in.*lbf}


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Using SST, connect the pressure feed tube assembly to the power steering link assembly.

    SST
    09023-12701
    Torque:
    Without SST:
    25 N*m{250 kgf*cm, 18 ft.*lbf}
    With SST:
    22 N*m{227 kgf*cm, 16 ft.*lbf}
    NOTICE:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when SST is parallel to the torque wrench.


6. INSTALL RETURN TUBE ASSEMBLY (for 2AZ-FE RHD)


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Using SST, install the return tube assembly to the power steering link assembly.

    SST
    09023-12701
    Torque:
    Without SST:
    25 N*m{250 kgf*cm, 18 ft.*lbf}
    With SST:
    22 N*m{227 kgf*cm, 16 ft.*lbf}
    NOTICE:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when SST is parallel to the torque wrench.


7. CONNECT STEERING GEAR OUTLET RETURN TUBE (for 2AZ-FE RHD)


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Connect the steering gear outlet return tube to the return tube assembly with the clip.

    NOTICE:
    1. Connect the steering gear outlet return tube with the paint mark facing upward.
    2. Push the steering gear outlet return tube as far as it will go as shown in the illustration.
    3. Install the clip at the position specified in the illustration.


8. CONNECT PRESSURE FEED TUBE ASSEMBLY (for 2GR-FE RHD)


    Camry. Acv40 Gsv40
  1. Install the pressure feed tube assembly clamp with the bolt.

    Torque:
    9.8 N*m{100 kgf*cm, 87 in.*lbf}


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Using SST, connect the pressure feed tube assembly to the power steering link assembly.

    SST
    09023-12701
    Torque:
    Without SST:
    25 N*m{250 kgf*cm, 18 ft.*lbf}
    With SST:
    22 N*m{227 kgf*cm, 16 ft.*lbf}
    NOTICE:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when SST is parallel to the torque wrench.


9. INSTALL RETURN TUBE ASSEMBLY (for 2GR-FE RHD)


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Using SST, install the return tube assembly to the power steering link assembly.

    SST
    09023-12701
    Torque:
    Without SST:
    25 N*m{250 kgf*cm, 18 ft.*lbf}
    With SST:
    22 N*m{227 kgf*cm, 16 ft.*lbf}
    NOTICE:
    Install the return tube assembly at the angle specified in the illustration.
    NOTICE:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when SST is parallel to the torque wrench.


10. CONNECT STEERING GEAR OUTLET RETURN TUBE (for 2GR-FE RHD)


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Connect the steering gear outlet return tube to the return tube assembly with the clip.

    NOTICE:
    1. Push the steering gear outlet return tube as far as it will go as shown in the illustration.
    2. Install the clip at the position specified in the illustration.


11. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
HINT:
Refer to the instructions for installation of the engine assembly (CAMRY_ACV40 RM000000YIK01OX.html for 2GR-FE).


12. CONNECT TIE ROD ASSEMBLY LH
  1. Connect the tie rod assembly LH to the steering knuckle with the nut.

    Torque:
    49 N*m{500 kgf*cm, 36 ft.*lbf}
  1. Install a new cotter pin.

    NOTICE:
    Further tighten the nut up to 60° if the holes for the cotter pin are not aligned.


13. CONNECT TIE ROD ASSEMBLY RH
HINT:
Perform the same procedure as for the LH side.


14. CONNECT STEERING SLIDING YOKE


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Align the matchmarks on the steering sliding yoke and the steering link assembly.



    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Install the bolt.

    Torque:
    35 N*m{360 kgf*cm, 26 ft.*lbf}


15. INSTALL FRONT WHEELS
Torque:
103 N*m{1,050 kgf*cm, 76 ft.*lbf}


16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


17. BLEED POWER STEERING FLUID
  1. Check the fluid level (CAMRY_ACV40 RM000001A0S01SX_01_0006.html).

  1. Jack up the front of the vehicle and support it with stands.

  1. Turn the steering wheel.

    1. With the engine stopped, turn the steering wheel slowly from lock to lock several times.

  1. Lower the vehicle.

  1. Start the engine.

    1. Run the engine at idle for a few minutes.

  1. Turn the steering wheel.

    1. With the engine idling, turn the steering wheel left or right to the full lock position and keep it in that position for 2 to 3 seconds, then turn the steering wheel to the opposite full lock position and keep it there for 2 to 3 seconds.

    2. Repeat this procedure several times.

  1. Stop the engine.



    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Check for foaming or emulsification.

    HINT:
    If the system has to be bled twice because of forming or emulsification, be sure to check for fluid leaks in the system.
  1. Check the fluid level (CAMRY_ACV40 RM000001A0S01SX_01_0006.html).



18. CHECK POWER STEERING FLUID LEVEL
  1. Keep the vehicle level.



    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. With the engine stopped, check the fluid level in the fluid reservoir.
    If necessary, add fluid.

    Fluid:
    ATF DEXRON II or III, or equivalent
    HINT:
    If the fluid is hot, check that the fluid level is within the HOT range on the fluid reservoir. If the fluid is cold, check that the fluid level is within the COLD range.
  1. Start the engine and run it at idle.

  1. Turn the steering wheel from lock to lock several times to raise fluid temperature.

    Fluid temperature:
    75°C (167°F) to 80°C (176°F)


    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. Check for foaming or emulsification.
    If foaming or emulsification is identified, bleed the power steering system (CAMRY_ACV40 RM000001BOQ01MX_01_0001.html).



    Camry. Acv40 Gsv40.Power Steering.Power Steering System.Power Steering Link  Installation
  1. With the engine idling, measure the fluid level in the fluid reservoir.

  1. Stop the engine.

  1. Wait a few minutes and remeasure the fluid level in the fluid reservoir.

    Maximum fluid level rise:
    5 mm (0.20 in.)
    If a problem is found, bleed the power steering system (CAMRY_ACV40 RM000001BOQ01MX_01_0001.html).
  1. Check the fluid level.



19. CHECK FOR POWER STEERING FLUID LEAKAGE


20. CHECK FOR EXHAUST GAS LEAKS


21. PLACE FRONT WHEELS FACING STRAIGHT AHEAD


22. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
HINT:
(CAMRY_ACV40 RM0000011DA02IX.html)