Floor Shift Lever Assembly Installation

Transmission. Camry. Acv40 Gsv40
E351 Manual Transaxle. Camry. Acv40 Gsv40

  1. INSTALL FLOOR SHIFT LEVER ASSEMBLY

  2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

  3. INSTALL UPPER CONSOLE REAR PANEL SUB-ASSEMBLY

  4. INSTALL UPPER CONSOLE PANEL

  5. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

Floor Shift Lever Assembly -- Installation



1. INSTALL FLOOR SHIFT LEVER ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the shift lever assembly with the 4 bolts.

    Torque:
    12 N*m{122 kgf*cm, 9 ft.*lbf}


2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    Camry. Acv40 Gsv40.E351 Manual Transaxle.Manual Transaxle System.Floor Shift Lever Assembly  Installation
  1. Connect the control cable to the shift lever retainer.

    NOTICE:
    1. The projecting part of the cable outer should face upward when the shift cable is connected.
    2. After installation, make sure that the cable outer lock is projecting from A as shown in the illustration.


    Camry. Acv40 Gsv40.E351 Manual Transaxle.Manual Transaxle System.Floor Shift Lever Assembly  Installation
  1. Connect the end of the shift cable to the shift lever assembly with the clip.

  1. Connect the end of the select cable to the shift lever assembly with a new clip.

    NOTICE:
    1. The serrated part of the select cable point should face upward when the select cable point is connected.
    2. The clip should be installed in the direction as shown in the illustration.


3. INSTALL UPPER CONSOLE REAR PANEL SUB-ASSEMBLY


    Camry. Acv40 Gsv40
  1. Engage the 3 claws and 5 clips to install the upper console rear panel sub-assembly.



4. INSTALL UPPER CONSOLE PANEL


    Camry. Acv40 Gsv40
  1. Engage the 2 claws and the 5 clips to install the upper console panel as shown in the illustration.



5. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    Camry. Acv40 Gsv40
  1. Engage the 2 clips and install the No. 2 instrument cluster finish panel garnish.



6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    Camry. Acv40 Gsv40
  1. Engage the 2 clips and install the No. 1 instrument cluster finish panel garnish.



7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the shift lever knob sub-assembly.