Timing Chain Installation

Engine. Camry. Acv40 Gsv40
2Az-Fe Engine Mechanical. Camry. Acv40 Gsv40

  1. INSTALL NO. 2 CHAIN SUB-ASSEMBLY

  2. INSTALL CRANKSHAFT TIMING SPROCKET

  3. INSTALL NO. 1 CHAIN VIBRATION DAMPER

  4. INSTALL CHAIN SUB-ASSEMBLY

  5. INSTALL CHAIN TENSIONER SLIPPER

  6. INSTALL TIMING CHAIN GUIDE

  7. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE

  8. INSTALL TIMING CHAIN CASE OIL SEAL

  9. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

  10. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  11. INSTALL ENGINE MOUNTING BRACKET RH

  12. INSTALL ENGINE MOUNTING INSULATOR

  13. INSTALL OIL PAN SUB-ASSEMBLY

  14. INSTALL CRANK POSITION SENSOR

  15. INSTALL CRANKSHAFT PULLEY

  16. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY

  17. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  18. INSTALL NO. 2 VENTILATION HOSE

  19. INSTALL VENTILATION HOSE

  20. INSTALL IGNITION COIL ASSEMBLY

  21. INSTALL VANE PUMP ASSEMBLY

  22. INSTALL GENERATOR ASSEMBLY

  23. INSTALL V-RIBBED BELT

  24. INSTALL NO. 2 ENGINE MOUNTING BRACKET RH

  25. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY

  26. INSTALL NO. 2 ENGINE MOUNTING STAY RH

  27. INSTALL FRONT EXHAUST PIPE ASSEMBLY

  28. ADD ENGINE OIL

  29. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  30. CHECK FOR ENGINE OIL LEAKS

  31. CHECK FOR EXHAUST GAS LEAKS

  32. CHECK IGNITION TIMING

  33. INSTALL FRONT FENDER APRON SEAL RH

  34. INSTALL ENGINE UNDER COVER LH

  35. INSTALL ENGINE UNDER COVER RH

  36. INSTALL FRONT WHEEL RH

  37. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

Timing Chain -- Installation



1. INSTALL NO. 2 CHAIN SUB-ASSEMBLY


    Camry. Acv40 Gsv40
  1. Set the crankshaft key into the left horizontal position.

  1. Turn the drive shaft so that the cutout faces upward.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Align the yellow mark links with the timing marks of each gear as shown in the illustration.

  1. Install the sprockets onto the crankshaft and oil pump shaft with the chain wrapped on the gears.

  1. Temporarily tighten the oil pump drive shaft sprocket with the nut.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Insert the damper spring into the adjusting hole, and then install the chain tensioner plate with the bolt.

    Torque:
    12 N*m{122 kgf*cm, 9 ft.*lbf}


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Align the adjusting hole of the oil pump drive shaft sprocket with the groove of the oil pump.

  1. Insert a 4 mm diameter bar into the adjusting hole of the oil pump drive shaft gear to lock the gear in position, and then tighten the nut.

    Torque:
    30 N*m{301 kgf*cm, 22 ft.*lbf}


    Camry. Acv40 Gsv40
  1. Rotate the crankshaft clockwise by 90°, and align the crankshaft key to the top.



2. INSTALL CRANKSHAFT TIMING SPROCKET


    Camry. Acv40 Gsv40
  1. Install the crankshaft timing sprocket.



3. INSTALL NO. 1 CHAIN VIBRATION DAMPER


    Camry. Acv40 Gsv40
  1. Install the chain vibration damper with the 2 bolts.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}


4. INSTALL CHAIN SUB-ASSEMBLY


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Set the No. 1 cylinder to TDC/compression.

    1. Turn the camshafts with a wrench (using the hexagonal lobe) to align the timing marks of the camshaft timing gear with each timing mark located on the No. 1 and No. 2 bearing caps as shown in the illustration.



    2. Camry. Acv40 Gsv40
    3. Using the crankshaft pulley bolt, turn the crankshaft to position with the key on the crankshaft upward.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install the chain onto the crankshaft timing sprocket with the gold or pink mark link aligned with the timing mark on the crankshaft.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Using SST and a hammer, tap in the crankshaft timing sprocket.

    SST
    09309-37010


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Align the gold or yellow link with each timing mark located on the camshaft timing gear and sprocket, then install the chain.



5. INSTALL CHAIN TENSIONER SLIPPER


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install the chain tensioner slipper with the bolt.

    Torque:
    19 N*m{194 kgf*cm, 14 ft.*lbf}


6. INSTALL TIMING CHAIN GUIDE


    Camry. Acv40 Gsv40
  1. Install the timing chain guide with the bolt.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}


7. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE


    Camry. Acv40 Gsv40
  1. Install the sensor plate with the "F" mark facing forward.



8. INSTALL TIMING CHAIN CASE OIL SEAL


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Using SST, tap in a new oil seal until its surface is flush with the timing chain cover edge.

    SST
    09223-22010
  1. Apply a light coat of MP grease to the lip of the oil seal.

    NOTICE:
    Keep the gap between the timing chain cover edge and the oil seal free of foreign matter.


9. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Apply seal packing (diameter: 4.0 to 4.5 mm (0.157 to 0.177 in.)) as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or Equivalent


  1. Apply seal packing in a continuous bead as shown in the illustration.


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or Equivalent
    NOTICE:
    1. Remove any oil from the contact surface.
    1. Install the chain cover within 3 minutes after applying seal packing.
    1. Do not start the engine for at least 2 hours after installing.


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install the timing chain cover with the 12 bolts and 2 nuts.

    Torque:
    Bolt A:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}
    Bolt B:
    25 N*m{255 kgf*cm, 18 ft.*lbf}
    Bolt C:
    55 N*m{561 kgf*cm, 41 ft.*lbf}
    Nut:
    11 N*m{112 kgf*cm, 8 ft.*lbf}
    Bolt length
    Item
    Length
    Bolt A
    30 mm (1.18 in.) length for 10 mm head
    Bolt B
    30 mm (1.18 in.) length for 12 mm head
    Bolt C
    40 mm (1.57 in.) length for 14 mm head
  1. Using a E10 "torx" socket, install the stud bolt to the drive belt tensioner.

    Torque:
    22 N*m{220 kgf*cm, 16 ft.*lbf}


10. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the V-ribbed belt tensioner with the bolt and nut.

    Torque:
    60 N*m{607 kgf*cm, 44 ft.*lbf}
    NOTICE:
    Do not lift the engine more than necessary.


11. INSTALL ENGINE MOUNTING BRACKET RH


    Camry. Acv40 Gsv40
  1. Install the engine mounting bracket with the 3 bolts.

    Torque:
    54 N*m{551 kgf*cm, 40 ft.*lbf}


12. INSTALL ENGINE MOUNTING INSULATOR


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Raise the engine and install the engine mounting insulator RH.

  1. Install the engine mounting insulator RH with the 4 nuts.

    Torque:
    Nut A:
    95 N*m{969 kgf*cm, 70 ft.*lbf}
    Nut B:
    87 N*m{888 kgf*cm, 64 ft.*lbf}


    Camry. Acv40 Gsv40
  1. Install the steering gear return tube clamps to the frame with the 2 bolts.

    Torque:
    8.0 N*m{80 kgf*cm, 69 in.*lbf}


    Camry. Acv40 Gsv40
  1. Install the engine mounting insulator FR with the bolt.

    Torque:
    87 N*m{888 kgf*cm, 64 ft.*lbf}


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. M/T:
    Install the engine lateral control rod with the bolt.

    Torque:
    89 N*m{910 kgf*cm, 66 ft.*lbf}


13. INSTALL OIL PAN SUB-ASSEMBLY


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Remove any old packing material and be careful not to drop any oil on the contact surfaces of the cylinder block and oil pan.

  1. Apply a continuous bead of seal packing (Diameter 3.0 to 4.0 mm (0.118 to 0.157 in.)) as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Block, Three Bond 1207B or Equivalent
    NOTICE:
    1. Remove any oil from the contact surfaces.
    2. Install the oil pan within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.
  1. Install the oil pan to the cylinder block.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Uniformly tighten the 12 bolts and 2 nuts in the sequence shown in the illustration.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}


14. INSTALL CRANK POSITION SENSOR


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Apply a light coat of engine oil to the O-ring on the crankshaft position sensor.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install the crankshaft position sensor with the bolt.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}
  1. Connect the crankshaft position sensor connector.



15. INSTALL CRANKSHAFT PULLEY
  1. Align the pulley set key with the key groove of the pulley.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Using SST, fix the pulley in place and tighten the bolt.

    SST
    09213-54015(91651-60855)
    09330-00021
    Torque:
    180 N*m{1,835 kgf*cm, 133 ft.*lbf}


16. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Release the ratchet pawl, then fully push in the plunger and hook the hook to the pin so that the plunger is in the position shown in the illustration.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install a new gasket and the chain tensioner with the 2 nuts.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}
    NOTICE:
    If the hook releases the plunger while the chain tensioner is being installed, set the hook again.


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Turn the crankshaft counterclockwise, then disconnect the plunger knock pin from the hook.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Turn the crankshaft clockwise, then check that the plunger is extended.



17. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Remove any old packing material from the contact surface.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Apply seal packing to the 2 locations shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Block, Three Bond 1207B or Equivalent
    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover within 3 minutes of applying seal packing.
    3. Do not add engine oil for at least 2 hours after installing the cylinder head cover.


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install the cylinder head cover with the 8 bolts and 2 nuts.

    Torque:
    Bolt A:
    11 N*m{112 kgf*cm, 8 ft.*lbf}
    Bolt B:
    14 N*m{143 kgf*cm, 10 ft.*lbf}
    Nut:
    11 N*m{112 kgf*cm, 8 ft.*lbf}


    Camry. Acv40 Gsv40
  1. Install the 2 engine wires with the 2 bolts.

    Torque:
    8.4 N*m{86 kgf*cm, 74 in.*lbf}


18. INSTALL NO. 2 VENTILATION HOSE


19. INSTALL VENTILATION HOSE


20. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 4 ignition coils with the 4 bolts.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}


21. INSTALL VANE PUMP ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the vane pump to the engine with the 2 bolts.

    Torque:
    43 N*m{439 kgf*cm, 32 ft.*lbf}
  1. Connect the oil pressure switch connector.



22. INSTALL GENERATOR ASSEMBLY


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Install the generator assembly with the 2 bolts.

    Torque:
    Bolt A:
    21 N*m{215 kgf*cm, 16 ft.*lbf}
    Bolt B:
    52 N*m{530 kgf*cm, 38 ft.*lbf}


    Camry. Acv40 Gsv40
  1. Install the generator wire to terminal B with the nut.

    Torque:
    9.8 N*m{100 kgf*cm, 87 in.*lbf}
  1. Install the clamp bracket with the bolt.

    Torque:
    8.4 N*m{86 kgf*cm, 74 in.*lbf}
  1. Attach the clamp and connect the generator connector to the generator.



23. INSTALL V-RIBBED BELT


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. Using SST and 19 mm socket wrench, loosen the V-ribbed belt tensioner arm clockwise, then install the V-ribbed belt.

    SST
    09216-42010
    NOTICE:
    1. Be sure to connect SST and the tools so that they are in line during use.
    2. When retracting the tensioner, turn it clockwise slowly for 3 seconds or more. Do not apply force rapidly.
    3. After the tensioner is fully retracted, do not apply force any more than necessary.
  1. After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Check to confirm that the belt has not slipped out of the grooves on the bottom of the crank pulley by hand.



24. INSTALL NO. 2 ENGINE MOUNTING BRACKET RH


    Camry. Acv40 Gsv40
  1. Install the 3 bolts and No. 2 mounting bracket RH.

    Torque:
    52 N*m{531 kgf*cm, 38 ft.*lbf}


25. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the engine moving control rod with the 3 bolts.

    Torque:
    64 N*m{653 kgf*cm, 47 ft.*lbf}


    Camry. Acv40 Gsv40
  1. Install the ground cable with the bolt.

    Torque:
    8.4 N*m{85 kgf*cm, 74 in.*lbf}


26. INSTALL NO. 2 ENGINE MOUNTING STAY RH


    Camry. Acv40 Gsv40
  1. Install the No. 2 mounting stay RH with the 2 bolts.

    Torque:
    64 N*m{653 kgf*cm, 47 ft.*lbf}


27. INSTALL FRONT EXHAUST PIPE ASSEMBLY
HINT:
CAMRY_ACV40 RM000001XBL004X.html.


28. ADD ENGINE OIL


29. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque:
6.9 N*m{70 kgf*cm, 61 in.*lbf}


30. CHECK FOR ENGINE OIL LEAKS


31. CHECK FOR EXHAUST GAS LEAKS


32. CHECK IGNITION TIMING
  1. Warm up the engine.



    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. When using the intelligent tester:
    Check the ignition timing.

    1. Connect the intelligent tester to the DLC3.

    2. Enter DATA LIST MODE on the intelligent tester.

      Ignition timing:
      8 to 12° BTDC at idle
      HINT:
      Refer to the intelligent tester operator's manual for help when selecting the DATA LIST.


    Camry. Acv40 Gsv40.2Az-Fe Engine Mechanical.Engine.Timing Chain  Installation
  1. When not using the intelligent tester:
    Check the ignition timing.

    1. Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.

      SST
      09843-18040
      NOTICE:
      1. Confirm the terminal numbers before connecting them. Connection with a wrong terminal can damage the engine.
      2. Turn off all electrical systems before connecting the terminals.
      3. Perform this inspection after the cooling fan motor is turned off.


    2. Camry. Acv40 Gsv40
    3. Remove the No. 1 engine cover.

    4. Pull out the wire harness as shown in the illustration. Connect the clip of the timing light to the wire harness.

      NOTICE:
      1. Use a timing light which can detect the first signal.
      2. After checking, be sure to tape the wire harness.
    5. Check the ignition timing at idle.

      Ignition timing:
      8 to 12° BTDC at idle
      NOTICE:
      When checking the ignition timing, the transmission should be in neutral.
      HINT:
      After engine rpm is kept at 1,000 to 1,300 rpm for 5 seconds, check that it returns to idle speed.
    6. Disconnect terminals 13 (TC) and 4 (CG) of the DLC3.

    7. Check the ignition timing at idle.

      Ignition timing:
      5 to 15° BTDC at idle
    8. Confirm that the ignition timing moves to the advanced angle side when the engine rpm is increased.

    9. Remove the timing light.



33. INSTALL FRONT FENDER APRON SEAL RH


34. INSTALL ENGINE UNDER COVER LH


35. INSTALL ENGINE UNDER COVER RH


36. INSTALL FRONT WHEEL RH


37. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


    Camry. Acv40 Gsv40
  1. Install the engine cover with the 2 nuts.

    Torque:
    9.0 N*m{92 kgf*cm, 80 in.*lbf}