Lexus IS250 IS220d GSE20 ALE20 4GR-FSE ENGINE CONTROL SYSTEM
THROTTLE BODY - INSTALLATION
1. INSTALL THROTTLE BODY |

Install a new gasket to the intake air surge tank.
- HINT:
- Align the protrusion of the gasket on the intake air surge tank.

Connect the 2 water by-pass hoses to the throttle body.

Install the throttle body with the 4 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Connect the throttle motor connector.
2. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE |

Install the air cleaner cap with air cleaner hose assembly with the 4 clamps and hose clamp.
- HINT:
- Be sure to install the air cleaner assembly so that the screw part of the hose clamp is as shown in the illustration.

Install the VSV hose to the air cleaner hose.

Connect the MAF meter connector and clamp to the air cleaner.
3. CONNECT NO. 2 VENTILATION HOSE |

Connect the ventilation hose to the cylinder head cover with the clamp.
4. ADD ENGINE COOLANT |
Tighten all the plugs and fill the radiator with TOYOTA Super Long Life Coolant (SLLC).
- Torque:
- 13 N*m{ 130 kgf*cm, 9 ft.*lbf}for cylinder block drain cock plug
Add engine coolant.
- Specified capacity:
- 9.1 liters (9.6 US qts, 8.0 lmp. qts)
- HINT:
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level is low, add coolant.
Install the radiator cap and reservoir cap.
Bleed air from the cooling system.
- NOTICE:
- Before starting the engine to warm up the engine, turn the A/C switch OFF.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
- HINT:
- The thermostat open timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.
- NOTICE:
- When pressing the radiator hoses:
Maintain the engine speed at 2,000 to 2,500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
- NOTICE:
- When pressing the radiator hoses:
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
- NOTICE:
- Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
Check the coolant level in the radiator reservoir.
If the coolant level is low, add SLLC to the radiator reservoir FULL line.
5. CHECK FOR ENGINE COOLANT LEAKS |

- NOTICE:
- Before performing each inspection, turn the A/C switch OFF.
- CAUTION:
- Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf*cm2, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.
6. INSTALL ENGINE UNDER COVER |
7. CHECK FUNCTION OF THROTTLE BODY |

Check the throttle control motor operating sounds.
Turn the engine switch on (IG).
When pressing the accelerator pedal, check the operating sound of the running motor. Make sure that no friction noises emit from the motor.
If friction noise exists, replace the throttle body.
Check the throttle position sensor.

Connect the intelligent tester to the DLC3.
Turn the engine switch on (IG).
Turn the intelligent tester main switch ON.
Enter the following menus: DIAGNOSIS / ENHANCED OBD II / DATA LIST / THROTTLE POS AND THROTTLE POS #2.
Depress the accelerator pedal. When the throttle valve is fully opened, check that the value of the "Throttle Sensor Position" is within the specification.
- Standard throttle valve opening percentage:
- 60% or more
- NOTICE:
- When checking the standard throttle valve opening percentage, the shift lever should be in the N position.
If the percentage is less than 60%, replace the throttle body.
8. INSTALL V-BANK COVER SUB-ASSEMBLY |

Engage the 2 clips on the front of the cover, and then engage the clip on the rear to install the V-bank cover.
- NOTICE:
9. INSTALL ENGINE ROOM SIDE COVER RH |

Install the side cover with the 2 clips.
10. INSTALL COOL AIR INTAKE DUCT SEAL |

Install the intake duct seal with the 11 clips.