Control Valve Assembly -- Installation |
1. INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY |
Install the No. 2 height control valve with the 2 bolts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
2. CONNECT HEIGHT CONTROL TUBE |
Connect the 3 height control tubes (LandCruiser RM000001U54015X.html).
- HINT:
- For the connection procedure of the tubes (type 1 and type 2), refer to Precaution of the Suspension Control System section.
Connect the connector.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (LandCruiser RM000003YMF011X.html).
4. CHECK CONNECTION OF TUBE FOR AIR LEAK |