Starter Installation


  1. INSTALL FLYWHEEL HOUSING SIDE COVER

  2. INSTALL STARTER ASSEMBLY

  3. INSTALL STARTER COVER

  4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Starter -- Installation



1. INSTALL FLYWHEEL HOUSING SIDE COVER


2. INSTALL STARTER ASSEMBLY
  1. Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{377 kgf*cm, 27 ft.*lbf}
  1. Connect the starter wire with the bolt and nut.

    Torque:
    for bolt:
    8.0 N*m{82 kgf*cm, 71 in.*lbf}
    for nut:
    9.8 N*m{100 kgf*cm, 87 in.*lbf}
  1. Close the terminal cap.

  1. Connect the starter connector.

  1. Connect the ground wire with the bolt.

    Torque:
    13 N*m{133 kgf*cm, 10 ft.*lbf}


3. INSTALL STARTER COVER
  1. Install the starter cover with the 3 bolts.

    Torque:
    12 N*m{117 kgf*cm, 8 ft.*lbf}


4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
  1. Install the exhaust manifold sub-assembly LH (LandCruiser RM00000456E00XX.html).



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (LandCruiser RM000003YMF011X.html).