Pcv Valve Installation


  1. INSTALL PCV VALVE SUB-ASSEMBLY

  2. CONNECT HEATER HOSE

  3. INSTALL V-BANK COVER

Pcv Valve -- Installation



1. INSTALL PCV VALVE SUB-ASSEMBLY
  1. Apply adhesive to 2 or 3 threads of the PCV valve.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
  1. Install the PCV valve.

    Torque:
    27 N*m{275 kgf*cm, 20 ft.*lbf}
  1. Connect the PCV hose to the valve.

  1. Secure the hose with the clamp.



2. CONNECT HEATER HOSE
  1. Connect the heater hose clamp.



3. INSTALL V-BANK COVER


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gr-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Pcv Valve  Installation
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

    Text in Illustration
    *1
    Pin
    *2
    Hook