Fuel Supply Pump -- Inspection |
1. INSPECT SUPPLY PUMP ASSEMBLY |
Inspect the pre-stroke control valve assembly.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 0.42 to 0.52 Ω
- HINT:
- The temperature indicated in "Condition" is the temperature of the pre-stroke control valve.