Diesel Throttle Body -- Installation |
1. INSTALL DIESEL THROTTLE BODY |
Place a new gasket and the diesel throttle body on the intake manifold.
Connect the throttle control motor connector.
Connect the throttle open switch connector.
2. INSTALL INTAKE FLANGE |
Install a new gasket and the intake flange with the 3 nuts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Connect the PCV hose.
Connect the manifold absolute pressure sensor connector.
Connect the heater water hose with the bolt.
- Torque:
- 14 N*m{138 kgf*cm, 10 ft.*lbf}
3. INSTALL INTAKE PIPE |
Install the intake pipe with the 2 bolts and tighten the hose clamp.
- Torque:
- for bolt:
- 18 N*m{184 kgf*cm, 13 ft.*lbf}
- for clamp:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
4. INSTALL RESONATOR WITH AIR CLEANER CAP SUB-ASSEMBLY |
Insert the hinge part of the air cleaner cap and hose into the air cleaner case, and then attach the 4 hook clamps.
Connect the air cleaner cap sub-assembly with the clamp.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
Attach the wire harness clamp.
Connect the 2 clamps and connector.