Ecd System (W/ Urea Scr System) Active Control Engine Mount System


DESCRIPTION

WIRING DIAGRAM

INSPECTION PROCEDURE

INSPECT INTAKE SYSTEM

INSPECT VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) (RESISTANCE)

INSPECT FRONT ENGINE MOUNTING INSULATOR

INSPECT VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) (POWER SOURCE VOLTAGE)

CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) - ECM)

CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE ASSEMBLY SUB-ASSEMBLY (FOR ENGINE MOUNTING) - NO. 1 INTEGRATION RELAY)

INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN2)

ECD SYSTEM (w/ Urea SCR System) - Active Control Engine Mount System


DESCRIPTION

The active control engine mount system decreases engine vibration at low engine speed using the vacuum switching valve sub-assembly (for engine mounting). The vacuum switching valve sub-assembly (for engine mounting) is controlled by a pulse signal transmitted to the vacuum switching valve sub-assembly (for engine mounting) from the ECM. The frequency of this pulse signal is matched to the engine speed to decrease engine vibration.

WIRING DIAGRAM


Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Active Control Engine Mount System


INSPECTION PROCEDURE

NOTICE:
  1. Inspect the fuses for circuits related to this system before performing the following inspection procedure.
  2. After replacing the ECM, the new ECM needs registration (LandCruiser RM0000012XK0AUX.html) and initialization (LandCruiser RM000000TIN08HX.html).
1.INSPECT INTAKE SYSTEM
  1. Inspect intake system (LandCruiser RM000001A3W03SX_01_0008.html).

    Result:
    Repair any trouble areas.


NG
REPAIR INTAKE SYSTEM
OK


2.INSPECT VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) (RESISTANCE)
  1. Inspect the vacuum switching valve sub-assembly (for engine mounting) (LandCruiser RM00000463G006X.html).



NG
REPLACE VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) (LandCruiser RM00000175900OX.html)
OK


3.INSPECT FRONT ENGINE MOUNTING INSULATOR
  1. Disconnect the vacuum hose from the front engine mount insulator assembly.

  1. Using a vacuum pump, apply vacuum of 80 kPa (600 mmHg, 23.622 in.Hg) and wait for 1 minute.

  1. Check that there is no change in the needle movement of the vacuum pump gauge.

  1. Check that there is no fluid leakage caused by a break in the diaphragm.

    OK:
    Vacuum does not leak.
  1. Reconnect the vacuum hose.



NG
REPLACE FRONT ENGINE MOUNTING INSULATOR (LandCruiser RM000005UTW000X.html)
OK


4.INSPECT VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) (POWER SOURCE VOLTAGE)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Active Control Engine Mount System
  1. Disconnect the vacuum switching valve sub-assembly (for engine mounting) connector.

  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    C80-1 - Body ground
    Engine switch on (IG)
    11 to 14 V
    Text in Illustration
    *1
    Front view of wire harness connector
    (to Vacuum Switching Valve Sub-assembly (for Engine Mounting))
  1. Reconnect the vacuum switching valve sub-assembly (for engine mounting) connector.



NG
Go to step 6
OK


5.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) - ECM)
  1. Disconnect the vacuum switching valve sub-assembly (for engine mounting) connector.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    C80-2 - C150-12 (ACM)
    Always
    Below 1 Ω
    C80-2 or C150-12 (ACM) - Body ground and other terminals
    Always
    10 kΩ or higher
  1. Reconnect the ECM connector.

  1. Reconnect the vacuum switching valve sub-assembly (for engine mounting) connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (VACUUM SWITCHING VALVE SUB-ASSEMBLY (FOR ENGINE MOUNTING) - ECM)
OK

REPLACE ECM (LandCruiser RM0000013Z002DX.html)

6.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE ASSEMBLY SUB-ASSEMBLY (FOR ENGINE MOUNTING) - NO. 1 INTEGRATION RELAY)
  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Disconnect the vacuum switching valve sub-assembly (for engine mounting) connector.

  1. Measure the resistance of the wire harness side connectors.

    Standard Resistance:

    Tester Connection
    Condition Specified
    Condition
    1K-22 - C80-1
    Always
    Below 1 Ω
    K-22 or C80-1 - Body ground and other terminals
    Always
    10 kΩ or higher


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


7.INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN2)
  1. Inspect the No. 1 Integration relay (EFI MAIN2) (LandCruiser RM00000469101AX_01_0006.html).



NG
REPLACE NO. 1 INTEGRATION RELAY
OK

INSPECT ECM POWER SOURCE CIRCUIT (LandCruiser RM000000TI20AMX.html)