Dtc P2716/77 Pressure Control Solenoid D Electrical (Shift Solenoid Valve Slt)
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SLT)
CHECK WIRE HARNESS (SHIFT SOLENOID VALVE SLT - TCM)
INSPECT SHIFT SOLENOID VALVE SLT
DTC P2716/77 Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT) |
DESCRIPTION
The throttle pressure that is applied to the primary regulator valve (which modulates the line pressure) causes the solenoid valve SLT, under electronic control, to precisely modulate and generate the line pressure according to the extent that the accelerator pedal is depressed or the output of engine power.This controls the line pressure and provides smooth shifting characteristics.Upon receiving a signal of the throttle valve opening angle, the TCM controls the line pressure by sending a predetermined duty ratio* to the solenoid valve, modulating the line pressure and generating throttle pressure.- HINT:
- *: The duty ratio is the ratio of the current on time (A) to the total of the current on and off time (A + B).
- Duty Ratio (%) = A / (A + B) x 100
DTC Code
| DTC Detection Condition
| Trouble Area
|
P2716/77
| TCM detects shift solenoid valve SLT circuit malfunction for 1 sec. or more (1 trip detection logic)
| - Open or short in shift solenoid valve SLT circuit
- Shift solenoid valve SLT
- TCM
|
WIRING DIAGRAM
INSPECTION PROCEDURE
1.INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SLT) |
Disconnect the E1 wire connector.
Measure the resistance of the transmission wire.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
2 (SLT+) - 6 (SLT-)
| 20°C (68°F)
| 5.0 to 5.6 Ω
|
2 (SLT+) - Body ground
| Always
| 10 kΩ or higher
|
6 (SLT-) - Body ground
| Always
| 10 kΩ or higher
|
2.CHECK WIRE HARNESS (SHIFT SOLENOID VALVE SLT - TCM) |
Disconnect the T19 TCM connector.
Measure the resistance of the wire harness side connector.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
T19-20 (SLT+) - T19-19 (SLT-)
| 20°C (68°F)
| 5.0 to 5.6 Ω
|
T19-20 (SLT+) - Body ground
| Always
| 10 kΩ or higher
|
T19-19 (SLT-) - Body ground
| Always
| 10 kΩ or higher
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
3.INSPECT SHIFT SOLENOID VALVE SLT |
Remove the shift solenoid valve SLT.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
1 - 2
| 20°C (68°F)
| 5.0 to 5.6 Ω
|
Connect the battery's positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.
- OK:
- Valve moves and makes an operating noise.
- HINT:
- Reference: Inspection using an oscilloscope.
- Check the waveform of the TCM connector.
- OK:
- Refer to illustration
Item
| Content
|
Tester Connection
| T19-20 (SLT+) - T19-19 (SLT-)
|
Tool Setting
| 5 V/DIV., 1 msec./DIV.
|
Condition
| Engine is idling
|
| REPLACE SHIFT SOLENOID VALVE SLT |
|
|
OK |
|
|
|
REPLACE TRANSMISSION WIRE |
|