Vacuum Switching Valve -- Installation |
1. INSTALL PURGE VSV |
![]() |
Install the purge VSV with the bolt.
- Torque:
- 9.0 N*m{92 kgf*cm, 80 in.*lbf}
Connect the 2 purge line hoses.
Connect the purge VSV connector.
2. INSTALL V-BANK COVER |
Install the cover with the 2 nuts.
- Torque:
- 7.5 N*m{76 kgf*cm, 66 in.*lbf}
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |