INSTALL MASS AIR FLOW METERINSTALL V-BANK COVER CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Mass Air Flow Meter -- Installation 1. INSTALL MASS AIR FLOW METERInstall a new O-ring to the MAF meter.Install the MAF meter with the 2 screws.Connect the MAF meter connector. 2. INSTALL V-BANK COVERTorque: 7.5 N*m{76 kgf*cm, 66 in.*lbf} 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL