Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Gr-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200
Air Switching Valve (For Bank 1) -- Installation |
1. INSTALL NO. 1 EMISSION CONTROL VALVE SET |
Install the No. 1 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Align the paint mark with the rib and connect the No. 1 air hose.
Text in Illustration *1 Rib *2 Paint Mark *a RH Side *b Top - HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
![]() |
Connect the No. 1 emission control valve set connector.
2. INSTALL AIR TUBE |
Install 2 new gaskets.
Text in Illustration *1 Claw *2 Air Tube - NOTICE:
- Make sure the gasket's claws are not caught between the No. 1 emission control valve set and air tube.
![]() |
Install the air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 in.*lbf}
3. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose.
Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
Tighten the clamp.
- Torque:
- 2.5 N*m{25 kgf*cm, 22 in.*lbf}
Attach the clamp and connect the ventilation hose, vacuum hose and mass air flow meter connector.
4. INSTALL V-BANK COVER |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Pin *2 Hook
![]() |