Cylinder Head - Replacement Heat the cylinder head to approximately 80 to 100°C (176 to 212°F). Read more about Cylinder Head - Replacement
Cylinder Head - Inspection Using a precision straightedge and feeler gauge, measure the warpage of the surfaces where the cylinder head contacts the cylinder block and manifold. Read more about Cylinder Head - Inspection
Cylinder Head - Disassembly Using SST and wooden blocks, compress the compression spring and remove the valve spring retainer locks. Read more about Cylinder Head - Disassembly
Cylinder Head - Components Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE MECHANICAL Read more about Cylinder Head - Components
Engine Unit - Installation Install the 2 noise filters to the cylinder head cover with the 2 bolts. Read more about Engine Unit - Installation
Engine Unit - Reassembly Install the timing chain cover stud bolt. Read more about Engine Unit - Reassembly
Engine Unit - Inspection Using a vernier caliper, measure the diameter of the elongated thread at the measuring point. Read more about Engine Unit - Inspection
Engine Unit - Disassembly Disconnect the sender gauge connector. Read more about Engine Unit - Disassembly
Engine Unit - Components Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE MECHANICAL Read more about Engine Unit - Components