Automatic Transmission Assembly Installation
INSPECT TORQUE CONVERTER CLUTCH ASSEMBLY
INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY
INSTALL NO. 1 ENGINE MOUNTING INSULATOR REAR
INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
INSTALL STIFFENER PLATE
CONNECT WIRE HARNESS
CONNECT CONNECTOR
INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
INSTALL STARTER ASSEMBLY
INSTALL TRANSMISSION CONTROL CABLE BRACKET
CONNECT TRANSMISSION CONTROL SHIFT CABLE ASSEMBLY
INSTALL OIL COOLER TUBE
INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY
INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY
INSTALL FRONT EXHAUST PIPE ASSEMBLY
INSTALL NO. 2 FRAME CROSSMEMBER SUB-ASSEMBLY
ADJUST SHIFT LEVER POSITION
ADD AUTOMATIC TRANSMISSION FLUID
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
PERFORM INITIALIZATION
INSPECT SHIFT LEVER POSITION
CHECK FOR EXHAUST GAS LEAKS
CHECK AUTOMATIC TRANSMISSION FLUID
Automatic Transmission Assembly -- Installation |
1. INSPECT TORQUE CONVERTER CLUTCH ASSEMBLY |
Inspect the torque converter clutch (Toyota Fortuner RM0000010NN00IX.html).
2. INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY |
Install the torque converter clutch to the automatic transmission.
Using a vernier caliper and straightedge, measure dimension A between the contact surfaces of the transmission and engine, and the contact surfaces of the converter and drive plate.
Using a vernier caliper and straightedge, measure dimension B shown in the illustration. Check that B is greater than A.
- Standard:
- B = A + 1.00 mm (0.0394 in.) or more
3. INSTALL NO. 1 ENGINE MOUNTING INSULATOR REAR |
Install the engine mounting insulator to the transmission with the 4 bolts.
- Torque:
- 47 N*m{479 kgf*cm, 35 ft.*lbf}
4. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY |
Install the transmission to the engine with the 5 bolts.
- Torque:
- 71 N*m{724 kgf*cm, 53 ft.*lbf}
Hold the crankshaft pulley bolt with a wrench and install the 6 torque converter clutch mounting bolts.
- Torque:
- 48 N*m{489 kgf*cm, 35 ft.*lbf}
5. INSTALL STIFFENER PLATE |
Install the No. 2 end plate.
Install the No. 4 cylinder block insulator.
Install the stiffener plate LH to the engine and transmission with the 4 bolts.
- Torque:
- 71 N*m{720 kgf*cm, 53 ft.*lbf}
Install the stiffener plate RH (with clamp tube) to the engine and transmission with the 4 bolts.
- Torque:
- 71 N*m{720 kgf*cm, 53 ft.*lbf}
Connect the connectors.
Connect the temperature sensor connector.
Connect the park/neutral position switch connector.
Connect the 3 speed sensor connectors.
Connect the transmission wire connector.
8. INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY |
*1: Install the 4 set bolts of the engine mounting insulator.
- Torque:
- 27 N*m{275 kgf*cm, 20 ft.*lbf}
*2: Install the frame crossmember with the 4 bolts and 4 nuts.
- Torque:
- 50 N*m{510 kgf*cm, 37 ft.*lbf}
9. INSTALL STARTER ASSEMBLY |
Install the starter (Toyota Fortuner RM0000013XI00CX.html).
10. INSTALL TRANSMISSION CONTROL CABLE BRACKET |
Install the control cable bracket with the 2 bolts.
- Torque:
- 28 N*m{286 kgf*cm, 21 ft.*lbf}
11. CONNECT TRANSMISSION CONTROL SHIFT CABLE ASSEMBLY |
Connect the control cable with the clip.
Connect the control cable with the nut.
- Torque:
- 14 N*m{143 kgf*cm, 10 ft.*lbf}
12. INSTALL OIL COOLER TUBE |
Loosely install the tip of the oil cooler tube inlet to the automatic transmission by hand.
Loosely install the tip of the oil cooler tube outlet to the automatic transmission by hand.
Install the 3 clamps with the 3 bolts.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf} for A and B
- 12 N*m{122 kgf*cm, 9 ft.*lbf} for C
Using a union nut wrench, tighten the inlet and outlet tubes.
- Torque:
- 34 N*m{346 kgf*cm, 25 ft.*lbf}
- NOTICE:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Toyota Fortuner RM000000UYX010X.html).
13. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY |
Coat a new O-ring with ATF, and install it to the oil filler tube.
Install the oil filler tube with the 2 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Install the oil dipstick.
14. INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY |
Install the propeller shaft with center bearing (Toyota Fortuner RM000000ZZ1008X.html).
15. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
Install the front exhaust pipe (Toyota Fortuner RM000000ZZ1008X.html).
16. INSTALL NO. 2 FRAME CROSSMEMBER SUB-ASSEMBLY |
Install the frame crossmember with the 4 bolts and 4 nuts.
- Torque:
- 50 N*m{510 kgf*cm, 37 ft.*lbf}
17. ADJUST SHIFT LEVER POSITION |
Move the shift lever to N.
Remove the nut and disconnect the control cable.
Turn the control shaft lever clockwise until it stops, and then turn it counterclockwise 2 notches to set it to the N position.
While holding the control shaft lever slightly toward the R position side, connect the cable with the nut.
- Torque:
- 16 N*m{163 kgf*cm, 12 ft.*lbf}
18. ADD AUTOMATIC TRANSMISSION FLUID |
- Fluid type:
- Toyota Genuine ATF Type T-IV
19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
20. PERFORM INITIALIZATION |
- HINT:
- Refer to "INTRODUCTION REPAIR INSTRUCTION-INITIALIZATION" and perform initialization.
21. INSPECT SHIFT LEVER POSITION |
When moving the shift lever from P to R with the ignition switch ON and the brake pedal depressed, make sure that the shift lever moves smoothly and correctly into position.
Start the engine and make sure that the vehicle moves forward after moving the shift lever from N to D, and moves rearward after shifting to the R.
If the results are not as specified, inspect the park/neutral position switch and check the shift lever.
22. CHECK FOR EXHAUST GAS LEAKS |
23. CHECK AUTOMATIC TRANSMISSION FLUID |