Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - A750F AUTOMATIC TRANSMISSION / TRANSAXLE

VALVE BODY ASSEMBLY - INSPECTION

1. INSPECT SHIFT SOLENOID VALVE SR
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Solenoid Connector (SR) - Solenoid Body (SR)20°C (68°F)11 to 15 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) → Shift solenoid valve SR connector
    Battery negative (-) → Shift solenoid valve SR body
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.


2. INSPECT SHIFT SOLENOID VALVE SLU
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Terminal 1 of shift solenoid valve SLU - terminal 220°C (68°F)5.0 to 5.6 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) with a 21 W bulb → Terminal 2
    Battery negative (-) → Terminal 1
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.


3. INSPECT SHIFT SOLENOID VALVE SL2
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Terminal 1 of shift solenoid valve SL2 - terminal 220°C (68°F)5.0 to 5.6 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) with a 21 W bulb → Terminal 1
    Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.


4. INSPECT SHIFT SOLENOID VALVE SLT
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Terminal 1 of shift solenoid valve SLT - terminal 220°C (68°F)5.0 to 5.6 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) with a 21 W bulb → Terminal 2
    Battery negative (-) → Terminal 1
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.


5. INSPECT SHIFT SOLENOID VALVE SL1
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Terminal 1 of shift solenoid valve SL1 - terminal 220°C (68°F)5.0 to 5.6 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) with a 21 W bulb → Terminal 1
    Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.


6. INSPECT SHIFT SOLENOID VALVE S1
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Solenoid Connector (S1) - Solenoid Body (S1)20°C (68°F)11 to 15 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) → Shift solenoid valve S1 connector
    Battery negative (-) → Shift solenoid valve S1 body
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.


7. INSPECT SHIFT SOLENOID VALVE S2
Valve Body Assembly - Inspection. A750F AUTOMATIC TRANSMISSION / TRANSAXLE. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    Solenoid Connector (S2) - Solenoid Body (S2)20°C (68°F)11 to 15 Ω

Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

  • OK:
  • Measurement ConditionSpecified Condition
    Battery positive (+) → Shift solenoid valve S2 connector
    Battery negative (-) → Shift solenoid valve S2 body
    Valve moves and makes an operating noise

If the result is not as specified, replace the solenoid valve.