Lexus IS250 IS220d GSE20 ALE20 2AD-FHV LUBRICATION

ENGINE OIL COOLER - INSTALLATION

1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Apply adhesive to 2 or 3 threads of the oil pressure switch assembly.

  • Adhesive:
  • Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the oil pressure switch assembly to the No. 1 oil cooler bracket.

  • Torque:
  • 15 N*m{ 153 kgf*cm, 11 ft.*lbf}
2. INSTALL NO. 1 OIL COOLER BRACKET
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Apply engine oil to 2 new O-rings.

  • NOTICE:
  • Do not apply engine oil to the O-ring labeled A.

Install the 3 O-rings to the No. 1 oil cooler bracket.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the No. 1 oil cooler bracket with the 6 bolts and nut.

  • Torque:
  • 11 N*m{ 112 kgf*cm, 8 ft.*lbf}
Bolt length
ItemLength
Bolt A36 mm (1.42 in.)
Except A49 mm (1.93 in.)
3. INSTALL NO. 1 TURBO OIL PIPE

Install 2 new gaskets to the No. 1 turbo oil pipe.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the No. 1 turbo oil pipe with the 2 union bolts.

  • Torque:
  • 35 N*m{ 357 kgf*cm, 26 ft.*lbf}
  • NOTICE:
  • Be sure to install union bolt A so that the gasket is positioned as shown in the illustration.

Install a new O-ring to the No. 3 water by-pass pipe.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the No. 3 water by-pass pipe with the 2 bolts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 16 ft.*lbf}
4. INSTALL OIL COOLER ASSEMBLY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Apply engine oil to 2 new O-rings.

  • NOTICE:
  • Do not apply engine oil to the O-ring labeled A.

Install the 3 O-rings to the oil cooler bracket.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the oil cooler assembly with the 5 bolts.

  • Torque:
  • 11 N*m{ 112 kgf*cm, 8 ft.*lbf}

Install the No. 1 water by-pass hose with the clip.

Connect the connector to the oil pressure switch.

5. INSTALL INTAKE MANIFOLD SUB-ASSEMBLY

Install a new intake manifold sub-assembly gasket to the cylinder head.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the intake manifold sub-assembly with the 7 bolts and 2 nuts.

  • Torque:
  • 23 N*m{ 235 kgf*cm, 17 ft.*lbf}
6. INSTALL INTAKE MANIFOLD STAY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the intake manifold stay with the 2 bolts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 16 ft.*lbf}
7. INSTALL COMMON RAIL ASSEMBLY
  • NOTICE:
  • In cases where the common rail is replaced, the fuel inlet pipe and injection pipe must also be replaced.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the common rail assembly with the 2 bolts.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the 2 fuel inlet pipes.

Temporarily install the No. 1, No. 2, No. 3 and No. 4 injection pipes.

Tighten the common rail assembly with the 2 bolts.

  • Torque:
  • 21 N*m{ 210 kgf*cm, 15 ft.*lbf}

Remove the No. 1, No. 2, No. 3 and No. 4 injection pipes.

Remove the 2 fuel inlet pipes.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the pressure discharge valve connector (*1).

Connect the fuel pressure sensor connector (*2).

Using pliers, slide the clip to connect the fuel hose as shown in the illustration.

8. INSTALL INLET FUEL PIPE SUB-ASSEMBLY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the 2 fuel inlet pipes, 2 injection pipe clamps and the bolt.

Using the SST, first tighten the nut at the common rail end of the fuel inlet pipe.

  • SST
  • 09023-38401
  • Torque:
  • 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
  • HINT:
Use of the proper SST is necessary to ensure that the correct torque is applied to the fuel inlet pipe nut.
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
Make sure that the pipe is not deformed or twisted during installation.
If the pipe is deformed or twisted, or if it cannot be installed properly, replace the pipe with a new one.

Using the SST, tighten the nut at the fuel supply pump of the fuel inlet pipe.

  • SST
  • 09023-38401
  • Torque:
  • 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
  • HINT:
Use of the proper SST is necessary to ensure that the correct torque is applied to the fuel inlet pipe nut.
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
Make sure that the pipe is not deformed or twisted during installation.
If the pipe is deformed or twisted, or if it cannot be installed properly, replace the pipe with a new one.

Tighten the 2 injection pipe clamps with the bolt.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
9. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
  • NOTICE:
  • In cases where an injector is replaced, the injection pipes must also be replaced.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the injection pipe.

Using the SST, first tighten the nut at the common rail end of the injection pipe.

  • SST
  • 09023-38401
  • Torque:
  • 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
  • HINT:
Use of the proper SST is necessary to ensure that the correct torque is applied to the injection pipe nut.
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
Make sure that the pipe is not deformed or twisted during installation.
If the pipe is deformed or twisted, or if it cannot be installed properly, replace the pipe with a new one.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Using the SST, tighten the nut at the injector end of the injection pipe.

  • SST
  • 09023-38401
  • Torque:
  • 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
  • HINT:
Use of the proper SST is necessary to ensure that the correct torque is applied to the injection pipe nut.
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
Make sure that the pipe is not deformed or twisted during installation.
If the pipe is deformed or twisted, or if it cannot be installed properly, replace the pipe with a new one.
10. INSTALL NO. 3 INJECTION PIPE SUB-ASSEMBLY
  • NOTICE:
  • In cases where an injector is replaced, the injection pipes must also be replaced.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the 3 injection pipes and the 4 injection pipe clamps with the 2 bolts.

Using the SST, first tighten the nut at the common rail end of the injection pipe.

  • SST
  • 09023-38401
  • Torque:
  • 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
  • HINT:
Use of the proper SST is necessary to ensure that the correct torque is applied to the injection pipe nut.
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
Make sure that the pipe is not deformed or twisted during installation.
If the pipe is deformed or twisted, or if it cannot be installed properly, replace the pipe with a new one.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Using the SST, tighten the nut at the injector end of the injection pipe.

  • SST
  • 09023-38401
  • Torque:
  • 27 N*m{ 275 kgf*cm, 20 ft.*lbf}
  • HINT:
Use of the proper SST is necessary to ensure that the correct torque is applied to the injection pipe nut.
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
Make sure that the pipe is not deformed or twisted during installation.
If the pipe is deformed or twisted, or if it cannot be installed properly, replace the pipe with a new one.
11. INSTALL NO. 2 INJECTION PIPE SUB-ASSEMBLY
  • HINT:
  • Perform the same procedure as for the No. 3 injection pipe.
12. INSTALL NO. 1 INJECTION PIPE SUB-ASSEMBLY
  • HINT:
  • Perform the same procedure as for the No. 3 injection pipe.

Tighten the 4 injection pipe clamps with the 2 bolts.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
13. INSTALL NO. 1 FUEL PIPE
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the No. 1 fuel pipe with the 2 bolts.

Connect the 2 fuel hoses and 2 clips.

14. REMOVE DIESEL THROTTLE BODY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install a new gasket and the diesel throttle body with the 2 nuts and 2 bolts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 16 ft.*lbf}
15. INSTALL NO. 4 AIR HOSE
16. INSTALL AIR PIPE SUB-ASSEMBLY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the wire harness clamp.

Install the air pipe sub-assembly with the bolt.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the intake air temperature sensor connector.

Tighten the 3 hose bands.

  • Torque:
  • 4.0 N*m{ 41 kgf*cm, 35 in.*lbf}
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the 2 diesel throttle body connectors.

17. INSTALL NO. 1 WATER OUTLET PIPE
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the No. 1 water outlet pipe with the 3 bolts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 16 ft.*lbf}

Connect the 2 water hoses with the 2 bands.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the manifold absolute pressure sensor connector and vacuum hose.

18. INSTALL EGR VALVE ASSEMBLY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install a new gasket and EGR valve assembly with the 2 bolts.

  • Torque:
  • 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
19. INSTALL NO. 2 EGR PIPE SUB-ASSEMBLY
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the intake manifold insulator.

  • HINT:
  • Insert the intake manifold insulator between the EGR valve and common rail to make contact with the intake manifold.

Install 2 new gaskets.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install No. 2 EGR pipe with the bolt and nut.

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the bolt and tighten the 2 bolts.

  • Torque:
  • 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Temporarily install the nut and tighten the 2 nuts.

  • Torque:
  • 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
20. INSTALL WIRE HARNESS CLAMP BRACKET
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the wiring harness clamp bracket with the 2 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the oil pressure switch assembly connector (*1).

Connect the EGR valve connector (*2).

Connect the 6 wire harness clamps (*3).

Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Connect the wire harness clamp.

21. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
  • Torque:
  • 5.4 N*m{ 55 kgf*cm, 48 in.*lbf}
22. ADD ENGINE OIL

Install the oil pan drain plug with a new gasket.

  • Torque:
  • 38 N*m{ 388 kgf*cm, 28 ft.*lbf}

Add engine oil according to the table below.

  • Standard capacity:
  • ItemCapacity
    Drain and refill with oil filter change6.0 liters (6.3 US qts, 5.3 lmp. qts)
    Drain and refill without oil filter change5.2 liters (5.5 US qts, 4.6 lmp. qts)
    Dry fill6.7 liters (7.1 US qts, 5.9 lmp. qts)
23. ADD ENGINE COOLANT

Tighten all the plugs.

  • Torque:
  • for cylinder block drain cock plug:
  • 20 N*m{ 204 kgf*cm, 15 ft.*lbf}

Add engine coolant.

  • Specified capacity:
  • 8.9 liters (9.4 US qts, 7.8 lmp. qts)
  • HINT:
The coolant reserve tanks of TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology that consists of a combination of low phosphates and organic acids).
Contact your TOYOTA dealer for further details.

Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

Squeeze the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.


If the coolant level is low, add coolant.

Install the radiator cap.

Bleed air from the cooling system.

  • NOTICE:
  • Before starting the engine, turn the A/C switch off.

Warm up the engine until the thermostat opens. While the thermostat is open, allow the coolant to circulate for several minutes.

  • HINT:
  • The thermostat open timing can be confirmed by squeezing the inlet radiator hose by hand, and sensing vibrations when the engine coolant starts to flow inside the hose.
  • NOTICE:
  • When squeezing the radiator hose:
Wear protective gloves.
Be careful as the radiator hoses are hot.
Keep your hands away from the radiator fan.

Maintain the engine speed at 2,000 to 2,500 rpm.

Squeeze the inlet and outlet radiator hoses several times by hand to bleed air from the system.

  • NOTICE:
  • When squeezing the radiator hoses:
Wear protective gloves.
Be careful as the radiator hoses are hot.
Keep your hands away from the radiator fan.

Stop the engine and wait until the engine coolant cools down to ambient temperature.

  • CAUTION:
  • Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Check the coolant level in the reserve tank.


If the coolant level is low, add coolant to the reserve tank FULL line.

24. CHECK FOR ENGINE OIL LEAKS
25. CHECK FOR ENGINE COOLANT LEAKAGE
  • CAUTION:
  • Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
  • NOTICE:
  • Before performing each inspection, turn the A/C switch off.
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Fill the radiator with coolant and attach a radiator cap tester.

Warm up the engine.

Using a radiator cap tester, increase the pressure inside the radiator to 177 kPa (1.8 kgf/cm, 26 psi), and check that the pressure does not drop.


If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.

26. CHECK FOR FUEL LEAKAGE

PERFORM ACTIVE TEST

Connect the intelligent tester to the DLC3.

Turn the engine switch ON (IG).

Turn the intelligent tester ON.

Enter the following menus: Powertrain / ENGINE / Active Test.

Perform the Active Test.

Intelligent Tester DisplayTest DetailsControl RangeDiagnostic Notes
Test the Fuel LeakPressurize common rail internal fuel pressure, and check for fuel leaksStop/Start
Fuel pressure inside common rail pressurized to specified value and engine speed increased to 2,000 rpm when "Start" is selected
Above conditions to be maintained while "Start" is selected
27. CHECK ENGINE OIL LEVEL

Warm up the engine, stop the engine and wait for 5 minutes. The oil level should be between the low and full level marks of the dipstick.


If the level is below the low level mark, check for leakage and add oil until it reaches the full level mark.

  • NOTICE:
  • Do not fill the engine oil above the full level mark.
28. INSTALL ENGINE ROOM SIDE COVER LH
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the side cover with the 4 clips.

29. INSTALL COOL AIR INTAKE DUCT SEAL
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the intake duct seal with the 11 clips.

30. INSTALL NO. 1 ENGINE COVER
Engine Oil Cooler - Installation. 2AD-FHV LUBRICATION. Lexus IS250 IS220d GSE20 ALE20

Install the No. 1 engine cover.

31. PERFORM INITIALIZATION

Perform initialization .

  • HINT:
  • Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.