Generator -- Installation |
1. INSTALL GENERATOR ASSEMBLY |
Temporarily install the generator with the 2 bolts.
Connect the vacuum pump oil outlet hose.
Install 2 new gaskets and the vacuum pump oil inlet hose with the union bolt.
- Torque:
- 14 N*m{140 kgf*cm, 10 ft.*lbf}
Connect the vacuum pump hose.
Attach the vacuum pump oil inlet hose to the cord clip.
Install the generator wire with the nut.
- Torque:
- 9.8 N*m{100 kgf*cm, 87 in.*lbf}
Install the terminal cap.
Connect the generator connector.
2. CONNECT COOLER COMPRESSOR ASSEMBLY |
Temporarily install the cooler compressor with the 2 bolts.
![]() |
Temporarily install the idle pulley bracket with the 4 bolts.
Tighten the 6 bolts in the sequence shown in the illustration.
- Torque:
- for bolt A:
- 45 N*m{459 kgf*cm, 33 ft.*lbf}
- except bolt A:
- 25 N*m{250 kgf*cm, 18 ft.*lbf}
Connect the wire harness with the bolt.
- Torque:
- 13 N*m{131 kgf*cm, 9 ft.*lbf}
Connect the cooler compressor connector.
3. INSTALL FAN AND GENERATOR V BELT |
Install the fan and generator V belt (LandCruiser RM00000122V00MX.html).
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (LandCruiser RM000003YMF011X.html).