Rear Stabilizer Bar Installation
INSTALL REAR STABILIZER BUSHING
INSTALL REAR STABILIZER BAR NO. 2 BRACKET
INSTALL REAR STABILIZER BAR NO. 1 BRACKET
INSTALL REAR STABILIZER BAR
INSTALL REAR STABILIZER LINK ASSEMBLY LH
INSTALL REAR STABILIZER LINK ASSEMBLY RH
INSTALL CENTER EXHAUST PIPE ASSEMBLY (for 2AZ-FE)
INSTALL CENTER EXHAUST PIPE ASSEMBLY (for 2GR-FE)
INSTALL TAIL EXHAUST PIPE ASSEMBLY (for 2GR-FE)
INSTALL REAR WHEELS
INSPECT EXHAUST GAS LEAK
Rear Stabilizer Bar -- Installation |
1. INSTALL REAR STABILIZER BUSHING |
Install the 2 rear stabilizer bushings to the outside of the stopper ring on the stabilizer bar.
2. INSTALL REAR STABILIZER BAR NO. 2 BRACKET |
Install the rear stabilizer bar No. 2 bracket.
3. INSTALL REAR STABILIZER BAR NO. 1 BRACKET |
Install the rear stabilizer bar No. 1 bracket.
4. INSTALL REAR STABILIZER BAR |
Install the rear stabilizer bar with the 2 bolts. (LH Side)
- Torque:
- 31 N*m{316 kgf*cm, 23 ft.*lbf}
Install the rear stabilizer bar with the 2 bolts. (RH Side)
- Torque:
- 31 N*m{316 kgf*cm, 23 ft.*lbf}
5. INSTALL REAR STABILIZER LINK ASSEMBLY LH |
Install the rear stabilizer link assembly LH with the 2 nuts.
- Torque:
- 39 N*m{398 kgf*cm, 29 ft.*lbf}
- HINT:
- If the ball joint turns together with the nut, use a hexagon wrench (5 mm) to hold the stud.
6. INSTALL REAR STABILIZER LINK ASSEMBLY RH |
Install the rear stabilizer link assembly RH with the 2 nuts.
- Torque:
- 39 N*m{398 kgf*cm, 29 ft.*lbf}
- HINT:
- If the ball joint turns together with the nut, use a hexagon wrench (5 mm) to hold the stud.
7. INSTALL CENTER EXHAUST PIPE ASSEMBLY (for 2AZ-FE) |
Install a new gasket onto the front exhaust pipe.
Install the center exhaust pipe assembly with the 2 bolts and 2 nuts.
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
8. INSTALL CENTER EXHAUST PIPE ASSEMBLY (for 2GR-FE) |
Install a new gasket to the exhaust center pipe assembly.
Install the exhaust center pipe to the exhaust front pipe with the 2 nuts and 2 bolts.
- Torque:
- 56 N*m{571 kgf*cm, 41 ft.*lbf}
9. INSTALL TAIL EXHAUST PIPE ASSEMBLY (for 2GR-FE) |
Install 2 new gaskets to the exhaust tail pipes.
Install the 2 exhaust tail pipes with the 4 nuts.
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
- Torque:
- 103 N*m{1,050 kgf*cm, 76 ft.*lbf}
11. INSPECT EXHAUST GAS LEAK |
If gas is leaking, tighten the areas necessary to stop the leak. Replace the damaged parts as necessary.