Fuel Injector -- Installation |
1. INSTALL FUEL INJECTOR ASSEMBLY |
Apply a light coat of gasoline or spindle oil to new O-rings, then install one onto each fuel injector.
![]() |
Apply a light coat of gasoline or spindle oil to the part of the fuel delivery pipe which comes into contact with the O-ring of the fuel injector.
![]() |
Apply a light coat of gasoline or spindle oil to the O-ring again, then install the right and left fuel injectors onto the fuel delivery pipe.
- NOTICE:
- Make sure that the O-ring is not cracked or jammed before installing the injector.
Check that the fuel injector rotates smoothly. If the fuel injector does not rotate, replace the O-ring.
2. INSTALL FUEL DELIVERY PIPE WITH INJECTOR |
Install 4 new insulators into the cylinder head.
![]() |
Install the 2 delivery pipe spacers onto the cylinder head.
Install the fuel delivery pipe together with the 4 fuel injectors, then temporarily tighten the 2 bolts.
- NOTICE:
- Be careful not to drop the fuel injectors when installing the fuel delivery pipe.
![]() |
Check that the fuel injector rotates smoothly.
If the fuel injector does not rotate smoothly, replace the O-ring.
Tighten the 2 bolts to the specified torque.
- Torque:
- 20 N*m{204 kgf*cm, 15 ft.*lbf}
![]() |
Connect the 4 fuel injector connectors.
![]() |
Install the 2 wire harness clamps.
3. INSTALL NO. 2 VENTILATION HOSE |
Connect the ventilation hose to the ventilation valve.
- NOTICE:
- Make sure that the paint mark and hose clamp are positioned as shown in the illustration after connecting the hose.
![]() |
4. CONNECT FUEL TUBE SUB-ASSEMBLY |
Install the fuel tube to the fuel hose clamp.
![]() |
Push the fuel tube connector until it makes a "click" sound.
![]() |
Install the No. 1 fuel pipe clamp.
![]() |
5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
Install the air cleaner filter element onto the air cleaner case.
Insert the hinges. Install the air cleaner cap sub-assembly with the 2 bolts.
![]() |
Align the matchmarks of the No. 1 air cleaner hose and throttle body, and then connect the air cleaner hose No. 1 to the throttle body and unfasten the No. 1 air cleaner hose clamp.
- NOTICE:
- Make sure that the hose clamp is at the correct angle.
![]() |
Connect the No. 2 ventilation hose to the air cleaner hose.
![]() |
Connect the purge line hose to the clamp (*1).
![]() |
Connect the 2 purge VSV vacuum hoses (*2).
Connect the purge VSV connector (*3).
Connect the mass air flow meter connector (*4).
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
7. CHECK FOR FUEL LEAKS |
- HINT:
8. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
Install the engine cover with the 2 nuts.
- Torque:
- 9.0 N*m{92 kgf*cm, 80 in.*lbf}
![]() |