Топливный Насос Высокого Давления -- Повторная Сборка |
1. INSTALL DELIVERY VALVE HOLDER |
Install 4 new gaskets and the 4 valves to the distributive head.
![]() |
Install the 4 springs to the 4 delivery valve holders.
Using SST, install the delivery holders.
- SST
- 09260-54012(09269-54020)
- Момент затяжки:
- 59 N*m{600 kgf*cm, 43 ft.*lbf}
2. INSTALL DISTRIBUTIVE HEAD PLUG |
Install a new O-ring to the distributive head plug.
![]() |
Using SST, install the head plug.
- SST
- 09260-54012(09262-54010)
- Момент затяжки:
- 88 N*m{900 kgf*cm, 65 ft.*lbf}
3. INSTALL TIMING CONTROL VALVE |
Using a 5 mm hexagon wrench, install the timing control valve with the 2 bolts.
Text in Illustration *1 5 mm Hexagon Wrench
![]() |
4. INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE |
Install a new washer and the hollow screw.
- Момент затяжки:
- 37 N*m{375 kgf*cm, 27 ft.*lbf}
![]() |
Install 2 new washers and the fuel pipe with the cap nut.
- Момент затяжки:
- 27 N*m{271 kgf*cm, 20 ft.*lbf}
Install the wiring bracket with the bolt.
- Момент затяжки:
- 8.0 N*m{82 kgf*cm, 71 in.*lbf}
5. INSTALL NO. 4 NOZZLE LEAKAGE PIPE |
Install 2 new washers and the nozzle leakage pipe with the overflow screw.
- Момент затяжки:
- 27 N*m{271 kgf*cm, 20 ft.*lbf}