Purge Valve - Installation
PURGE VALVE - INSTALLATION
Install the purge VSV with the bolt.
- Torque:
- 21 N*m{
214 kgf*cm, 15 ft.*lbf}
Connect the purge VSV connector.
Text in Illustration*a | Upper |
2. CONNECT PURGE LINE HOSE |
Connect the 2 purge line hoses.
- Turn the claw of the clip to the upper side.
3. INSTALL V-BANK COVER SUB-ASSEMBLY
|
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
Text in Illustration*1 | Bracket |
*2 | Hook |
*3 | Pin |
*4 | Grommet |