Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL
AIR SWITCHING VALVE (for Bank 2) - INSPECTION
1. INSPECT AIR SWITCHING VALVE ASSEMBLY |

Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 - 5 20°C (68°F) 4.5 to 5.5 Ω 1 - Body ground Always 1 MΩ or higher 5 - Body ground
*a | Component without harness connected (Air Switching Valve) |
- NOTICE:
- When measuring the resistance, do not touch terminals 2, 3 or 4.
- HINT:
- When measuring the resistance, make sure that the surface temperature of the air switching valve assembly is 20°C (68°F).
If the result is not as specified, replace the air switching valve assembly.

Check the operation of the air switching valve.
Check that air does not flow from port A to port B.
*1 | Port A |
*2 | Port B |
![]() | Air |
- NOTICE:
- Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.
If the result is not as specified, replace the air switching valve assembly.

Apply battery voltage across terminals 1 and 5.
*1 | Port A |
*2 | Port B |
*a | Component without harness connected (Air Switching Valve) |
![]() | Air |
- NOTICE:
- When applying voltage, do not touch terminals 2, 3 or 4.
Check that air flows from port A to port B.
If the result is not as specified, replace the air switching valve assembly.