Park / Neutral Position Switch Installation
INSTALL NEUTRAL START SWITCH ASSEMBLY
INSTALL ENGINE REAR MOUNTING MEMBER
INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
ADJUST SHIFT LEVER POSITION
INSPECT SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
INSTALL PROPELLER W/CENTER BEARING SHAFT ASSEMBLY
INSTALL FRONT EXHAUST PIPE ASSEMBLY
INSTALL ENGINE UNDER COVER AIR GUIDE BRACKET
ADD AUTOMATIC TRANSMISSION FLUID
INSTALL ENGINE UNDER COVER NO.2
CHECK FOR EXHAUST GAS LEAKS
PERFORM INITIALIZATION
Park / Neutral Position Switch -- Installation |
1. INSTALL NEUTRAL START SWITCH ASSEMBLY |
Install the park/neutral position switch to the manual valve shaft.
Temporarily install the bolt.
Install a new lock washer with the nut.
- Torque:
- 6.9 N*m{70 kgf*cm, 61 in.*lbf}
Temporarily install the control shaft lever.
Turn the control shaft lever counterclockwise until it stops, and turn it clockwise 2 notches to set it to the N position.
Remove the transmission control shaft lever.
Align the neutral basic line with the switch groove, and tighten the adjusting bolt.
- Torque:
- 13 N*m{133 kgf*cm, 9 ft.*lbf}
Using a screwdriver, bend the tabs of the lock washer.
Install the transmission control shaft lever RH with the nut.
- Torque:
- 16 N*m{163 kgf*cm, 12 ft.*lbf}
Connect the park/neutral position switch connector.
2. INSTALL ENGINE REAR MOUNTING MEMBER |
Install the engine rear mounting member to the automatic transmission assembly with the 4 nuts.
- Torque:
- 13 N*m{133 kgf*cm, 10 ft.*lbf}
Install the engine rear mounting member to the body with the 4 bolts.
- Torque:
- 26 N*m{260 kgf*cm, 19 ft.*lbf}
3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY |
Install the floor shift gear shifting rod sub-assembly with the nut.
- Torque:
- 13 N*m{130 kgf*cm, 9 ft.*lbf}
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
5. ADJUST SHIFT LEVER POSITION |
Remove the nut and disconnect the shifting rod.
Turn the control shaft lever of the neutral start switch counterclockwise until it stops, and turn it clockwise 2 notches to set it to the N position.
Move the shift lever to the N position and tighten the nut while lightly pushing the lever toward the R position.
- NOTICE:
- Do not push the shift lever too hard.
After adjustment, check that the shift lever moves smoothly and the shift lever and gear operate correctly.
6. INSPECT SHIFT LEVER POSITION |
When shifting from the P to the R position with the engine switch on (IG) and brake pedal depressed, make sure that the shift lever moves smoothly and moves correctly into position.
Start the engine and make sure that the vehicle moves forward when shifting from the N to the D position and moves rearward when shifting to the R position.
If operation cannot be done as specified, inspect the park/neutral position switch assembly and check the shift lever assembly installation condition.
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Measure resistance according to the value(s) in the table below when the shift lever is moved to each position.
- Standard resistance:
Shift Position
| Tester Connection
| Specified Condition
|
P
| 2 - 6 and 4 - 5
| Below 1 Ω
|
Except P
| ↑
| 10 kΩ higher
|
R
| 1 - 2
| Below 1 Ω
|
Except R
| ↑
| 10 kΩ higher
|
N
| 2 - 9 and 4 - 5
| Below 1 Ω
|
Except N
| ↑
| 10 kΩ higher
|
D, S, "+" and "-"
| 2 - 7
| Below 1 Ω
|
Except D, S, "+" and "-"
| ↑
| 10 kΩ higher
|
8. INSTALL PROPELLER W/CENTER BEARING SHAFT ASSEMBLY |
(Click here)
9. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
(Click here)
10. INSTALL ENGINE UNDER COVER AIR GUIDE BRACKET |
Install the engine under cover air guide bracket with the 2 bolts.
- Torque:
- 26 N*m{260 kgf*cm, 19 ft.*lbf}
11. ADD AUTOMATIC TRANSMISSION FLUID |
(Click here)
12. INSTALL ENGINE UNDER COVER NO.2 |
Install the under cover with the 4 screws, 2 grommets and 2 spacers.
13. CHECK FOR EXHAUST GAS LEAKS |
14. PERFORM INITIALIZATION |
(Click here)