  1. INSTALL NETWORK GATEWAY ECU

  2. INSTALL COWL SIDE JUNCTION BLOCK RH

  3. INSTALL WINDSHIELD WIPER RELAY ASSEMBLY

  4. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

  5. INSTALL INSTRUMENT PANEL BOX DOOR KNOB

  6. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  7. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY

  8. INSTALL COWL SIDE TRIM BOARD RH

  9. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

  10. INSTALL FRONT DOOR SCUFF PLATE RH

  11. INSTALL INSTRUMENT SIDE PANEL RH

  12. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH

  13. INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION

  14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  15. CHECK SRS WARNING LIGHT

Network Gateway Ecu (For Lhd) -- Installation


HINT:
A bolt without a torque specification is shown in the standard bolt chart (Click here).


1. INSTALL NETWORK GATEWAY ECU
  1. Install the network gateway ECU with the bolt.



2. INSTALL COWL SIDE JUNCTION BLOCK RH
  1. Connect the back side of the 2 connectors and attach the wire harness clamp.

  1. Install the cowl side junction block RH with the 2 nuts and screw.

    Torque:
    for Nut:
    7.6 N*m{77 kgf*cm, 67 in.*lbf}
  1. Connect the 5 connectors.



3. INSTALL WINDSHIELD WIPER RELAY ASSEMBLY
  1. Attach the guide and install the windshield wiper relay assembly with the screw.

  1. Connect the connector.



4. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Connect the connector.

  1. Attach the 3 claws to install the lower No. 2 instrument panel finish panel.



    Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Lhd)  Installation
  1. Install the 4 screws <C>.

    Text in Illustration
    *a
    Screw <C>


5. INSTALL INSTRUMENT PANEL BOX DOOR KNOB
HINT:
Use the same procedure for both instrument panel box door knobs.


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 2 claws to install the instrument panel box door knob.



6. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 6 claws to install the No. 3 instrument cluster finish panel garnish.



7. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY
  1. Check that the ignition switch is off.

  1. Check that the cable is disconnected from the negative (-) battery terminal.

    CAUTION:
    Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.


    Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Lhd)  Installation
  1. Connect the airbag connector and lock the connector lock.

    Text in Illustration
    *a
    Connector Lock
    NOTICE:
    When handling the airbag connector, take care not to damage the airbag wire harness.
  1. Attach the 4 claws to install the front passenger side knee airbag assembly.

  1. Install the 4 bolts.

    Torque:
    12 N*m{122 kgf*cm, 9 ft.*lbf}


8. INSTALL COWL SIDE TRIM BOARD RH


Land Cruiser. Urj200, 202 Grj200 Vdj200.Networking.Lin Communication System.Network Gateway Ecu (For Lhd)  Installation
  1. Attach the 2 clips to install the cowl side trim board RH.

  1. Install the cap nut.

    Text in Illustration
    *a
    Cap Nut


9. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Connect the connector.

  1. Attach the 3 guides.

  1. Attach the 4 claws to install the No. 2 instrument panel under cover sub-assembly.



10. INSTALL FRONT DOOR SCUFF PLATE RH
HINT:
Use the same procedures described for the LH side.


11. INSTALL INSTRUMENT SIDE PANEL RH


Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. w/ Airbag Cut Off Switch:

    1. Connect the connector.

  1. Attach the 6 claws to install the instrument side panel RH.



12. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH


  1. for Type A:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 11 claws and guide to install the lower instrument panel pad sub-assembly RH.



    2. Land Cruiser. Urj200, 202 Grj200 Vdj200
    3. Install the screw and clip.



  1. for Type B:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 7 claws to install the lower instrument panel pad sub-assembly RH.



    2. Land Cruiser. Urj200, 202 Grj200 Vdj200
    3. Install the screw and clip.



13. INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION


  1. for Type A:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 4 claws and 3 clips to install the No. 1 instrument panel finish panel cushion.



  1. for Type B:



      Land Cruiser. Urj200, 202 Grj200 Vdj200
    1. Attach the 7 claws to install the panel No. 1 instrument panel finish panel cushion.



14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


15. CHECK SRS WARNING LIGHT