Brake. Land Cruiser. Urj200, 202 Grj200 Vdj200
Brake Control Dynamic Control Systems. Land Cruiser. Urj200, 202 Grj200 Vdj200
Crawl Switch -- Installation |
1. INSTALL SUSPENSION CONTROL SWITCH (CRAWL SWITCH) |
Attach the 4 claws to install the suspension control switch (CRAWL switch).
![]() |
Connect the 2 connectors.
2. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY |
Connect the connectors.
![]() |
Attach the 14 claws to install the console panel.
3. INSTALL CONSOLE CUP HOLDER BOX SUB-ASSEMBLY |
Attach the 4 claws to install the box.
![]() |
4. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY |
Attach the 9 claws to install the panel.
![]() |
5. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY |
Connect the connectors.
![]() |
Attach the 7 claws to install the panel.
6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY |
Install the shift lever knob and twist it in the direction indicated by the arrow.
7. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH |
Attach the 7 claws to install the panel pad.
![]() |
Install the screw.
Install the clip.
8. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION |
Attach the 7 claws to install the panel cushion.
![]() |
9. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH |
Connect the connectors and 2 clamps.
![]() |
Attach the 8 claws to install the panel pad.
Install the screw.
Install the clip.
10. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION |
Attach the 7 claws to install the panel cushion.
![]() |
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).